0 Members and 1 Guest are viewing this topic.
Yeah, but you still have a significant chunk of layout to run on and work on without “wasting” time and materials. Plus, as you do it you refine what you want it to do and be. In that stage for my own layout I realized I had bitten off more than I could ever chew and deleted an entire deck of sceniced layout. Since I had already built the benchwork 1/3 of the deleted layout has morphed into a branch line. Its amazing the ideas that come to you as you run some trains on what you have.
It’s amazing the ideas that come to you as you run some trains on what you have.
Agreed. You'll recall that I built a "temporary loop" to allow a train to run laps while I worked the kinks out of the more complete design that I eventually built.It definitely helped me understand what was needed for the layout to produce the kind of operations I wanted to represent.Lee
But if you hold an impromptu ops session, at least your yard is up to the task!L
Add a sign near the road for more visibility.DFF
Or the more obvious answer is that the owner is a huge railfan and built the building facing the tracks so he had a front row seat fir those colorful Conrail consists