Author Topic: Conrail Windsor St Yard (York PA) Engineering Report  (Read 279851 times)

0 Members and 1 Guest are viewing this topic.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26047
  • Head Kino
  • Respect: +11502
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #795 on: June 06, 2016, 10:28:52 AM »
+1
Track is down. I repeat, track is down.

Not on all of it, and nothing is glued down or wired up, but it's actually starting to look like something.

Also, a recap of the past few months.

http://conrail1285.com/progress-up-the-ncr/










nuno81291

  • Crew
  • *
  • Posts: 753
  • Gender: Male
  • Respect: +319
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #796 on: June 06, 2016, 07:05:56 PM »
0
Very spacious looking scene shaping up.  :o
Guilford Rail System in the 80s/90s

Lemosteam

  • Crew
  • *
  • Posts: 6403
  • Gender: Male
  • PRR, The Standard Railroad of my World
  • Respect: +4816
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #797 on: June 06, 2016, 07:10:49 PM »
+1
Just for you @Ed Kapuscinski (sorta but not really) :

John "Lemosteam" LeMerise

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26047
  • Head Kino
  • Respect: +11502
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #798 on: June 06, 2016, 07:34:46 PM »
0
Awesome.

Also, as a follow up... I just completed the track. Need to do some wiring first, but it'll be possible to run a circuit soon.

davefoxx

  • Crew
  • *
  • Posts: 12334
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8559
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #799 on: June 06, 2016, 08:02:06 PM »
0
Just for you @Ed Kapuscinski (sorta but not really) :



Awesome!!!!!

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2098
  • Respect: +219
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #800 on: June 06, 2016, 08:06:15 PM »
+1
That bridge needs ME C55 bridge track with the guard rail installed

"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

davefoxx

  • Crew
  • *
  • Posts: 12334
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8559
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #801 on: June 06, 2016, 08:43:17 PM »
0
That bridge needs ME C55 bridge track with the guard rail installed

No bridge track, if it's a ballasted deck.  But, the guardrails would be okay.  What did the prototype do, @Ed Kapuscinski?

DFF

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26047
  • Head Kino
  • Respect: +11502
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #802 on: June 06, 2016, 09:11:22 PM »
0
It's a ballasted deck, with PRR AF railings.

All in good time.

Dave V

  • Crew
  • *
  • Posts: 12232
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11658
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #803 on: June 06, 2016, 09:19:55 PM »
0

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26047
  • Head Kino
  • Respect: +11502
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #804 on: June 06, 2016, 10:10:32 PM »
0
Yep. It makes my life immensely easier.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26047
  • Head Kino
  • Respect: +11502
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #805 on: June 07, 2016, 10:28:10 AM »
+2
I jumped the gun writing that blog post. I should've waited until today.

Because yesterday I put in "the golden spike", closing the loop at Hanover Junction.

While I don't have electricity to it yet (my Tony's order and Amazon order with the wiring supplies are on their way), I was able to "run" my beastly coal train around it with the old 0-5-0.






mcjaco

  • Crew
  • *
  • Posts: 1754
  • Respect: +147
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #806 on: June 07, 2016, 11:41:49 AM »
0
Yummy.
~ Matt

Modutrak.com

C855B

  • Crew
  • *
  • Posts: 11412
  • Respect: +2871
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #807 on: June 07, 2016, 12:14:55 PM »
0
:facepalm: :facepalm: :facepalm:

The pic of your bridge just made me feel stupid... I needed to get a 55-gallon drum of John's (@Lemosteam) shoes, but not 15 minutes ago sent an order off to Shapeways for one part for another project. Maybe 'cuz I hadn't finished my coffee? I dunno... stupid anyway.

Nice viaduct! :D  (Seriously. Very nice.)
...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.

wcfn100

  • Crew
  • *
  • Posts: 8945
  • Respect: +1381
    • Chicago Great Western Modeler
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #808 on: June 07, 2016, 12:20:49 PM »
0

The pic of your bridge just made me feel stupid... I needed to get a 55-gallon drum of John's (@Lemosteam) shoes, but not 15 minutes ago sent an order off to Shapeways for one part for another project. Maybe 'cuz I hadn't finished my coffee? I dunno... stupid anyway.



If you didn't know, SW allows you to add to previous orders.  It shows up somewhere towards the end of the billing/shipping pages I think.

Jason

Lemosteam

  • Crew
  • *
  • Posts: 6403
  • Gender: Male
  • PRR, The Standard Railroad of my World
  • Respect: +4816
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #809 on: June 07, 2016, 12:21:40 PM »
0
:facepalm: :facepalm: :facepalm:

The pic of your bridge just made me feel stupid... I needed to get a 55-gallon drum of John's (@Lemosteam) shoes, but not 15 minutes ago sent an order off to Shapeways for one part for another project. Maybe 'cuz I hadn't finished my coffee? I dunno... stupid anyway.

Nice viaduct! :D  (Seriously. Very nice.)

@C855B you can add to your current order without setup fee so long as your previous order has not printed yet.

@wcfn100 Great minds...
John "Lemosteam" LeMerise