0 Members and 1 Guest are viewing this topic.
I also want to point out: while I think it's odd, and kinda ugly, I'm sure there's an actual reason that we're not aware of.
And I'll counter that with my thought that there should have been a way to mitigate any of those reasons.Ed, we live in the 3rd decade of the 21st Century. With everything being designed in CAD, there should really be no place for such "reason" to exist. Imagine one of the German ICE, French TGV, or Japanese Shinkansen being designed with this type of mismatch? That would never fly! Even Amtrak's Acela was better designed (visually). Yes, I know, budgetary limits, blah, blah, blah. I say "BULL-CRAP!".
My point is that we, as enthusiasts on a message board, shouldn't be assuming that we know more about the thing than the actual professionals who's careers are involved in it.
Well, I slept at a Holiday Inn Express last night, so I think the mismatch probably has to do with something like the passenger cars tilt but the power cars do not. Either that, or the power cars were built to metric standards and the passenger cars built to imperial standards. DFF
and the power units were adapted from other off the shelf euro designs.
Here's a question that's on my mind...How good are Bachmann diesel locomotives these days? I had many of their early ones back in the 80's and I was not impressed. Poor runners, noisy, and not well detailed.FYI - I am not a Bachmann hater. I do have their Consolidation steam locomotive and am very happy with it. The Charger has been on my wish list for quite some time. Unless Kato announces one, I am thinking that I would need to bite the bullet and get the Bachmann Charger.Thanks,Bart
The Charger has been on my wish list for quite some time. Unless Kato announces one, I am thinking that I would need to bite the bullet and get the Bachmann Charger.
Bart,On Kato's youtube stream the other day, they mentioned wanting to make one (especially now that Amtrak has a common variant) but it'll probably have to be on hold until after the Big Boy is finished. The implication is that they won't be tooling up an Amtrak cascades/surfliner/midwest or Surfliner variant.