0 Members and 1 Guest are viewing this topic.
Bryan: If it took five years for the motor, how long do you expect for hanging the overhead? You ARE going to model the NH-style catenary, aren't you?
Maybe the ESM might want to sell this electric . He has the R&D , consumer trust , reputation , know how . I , in a heart beat , would buy one for <500 .
Yes, cat will be modeled. I already have it worked out and it won’t take long to do. But it will be the last scenery project as everything underneath must be finished first. This was the most difficult NH electric to make, and it was mentally draining to do. I had planned on making two, and a second one would be easier at this point. But I have at least five other electrics to build first, and then maybe I’ll revisit the notion of a second EP-3.
(Attachment Link) I've got one spot to touch up, but, did a second round of painting.
Absolutely amazing, Jesse! You have the patience of Job, without doubt, not to mention steady hands. Are you a microsurgeon in your day job? My offering this week is... finally!... serious ballasting on the GC&W. After overcoming years of fear and dread over this task, I have a process now that's fast enough to not frustrate that >>>>>> gets the result I'm after:<<<<<
Hey Capt , those don't look like steam fitters or engine re builders hands . I know a Capt has many hands , and arms , but there on other bodies .
An obvious new banner entry, plus an extra to play catch-up.
Um, what?As far as calling me captain, well, I'm not a captain, and implying that I am a member of the deck department is a bit insulting.