0 Members and 1 Guest are viewing this topic.
I don't agree that PTC contributed . Signal systems are shut down at times for reasons of maintenance or failure at times for various reasons . It is the nature of things that work , that sometimes they do not . Things that are important need backups . Not some well intentioned tower operator saying everything is good to go only because he didn't have knowledge it was not . If the signaling was down could that also mean loco / train detection was down . An accident could have left a car wreck on the tracks and the short ckt it may cause was undetectable . The NTSB failed to mandate a backup nation wide .
Careful there. Mistaking CSX for Conrail in this company could be dangerous...
Adam, please correct me if my "old practices" knowledge is out of date here. From what I'm reading so far, this is a "perfect storm" of errors and inattention:Crew from CSX train apparently left switch diverging. Whether this was properly communicated to the DS would be a matter of reviewing radio recordings.Signal reported "down for maintenance", which is completely different from "not operating". If taken out of operation it is possible heads were turned, which is to be read as not governing movement. If simply not operating and therefore dark, it would then invoke stop-and-proceed-at-restricted-speed per rules.The siding switch would normally throw a shunt across the rails if the siding track is not separately signaled and the switch is thrown diverging, resulting in a "stop" indication for the block. That it is alleged it was thrown and locked indicates that it was a non-signaled siding.The shunt should have caused an "approach" to be displayed at the previous signal......provided that the reason for "down for maintenance" did not also affect signal system communications. It is possible that the "down" could be problems in the cabinet and not with the signal itself, and the block (and shunt) were not being detected to pass the occupancy down the line.DS (evidently) gave instruction to the Amtrak head-end regarding maintenance issues at this signal and to expect it to be offline (turned heads), which is different than "ignore the inoperable signal," where rules would dictate "stop-and-proceed, etc."There's too much we don't know and won't know until the NTSB review. My stomach sunk when I read of this accident, as unfortunately it is shades of a similar accident we had on the SP around 1970. A maintainer "temporarily" jumpered a relay in the cabinet, resulting in a "clear" on the main when the siding switch was diverging into an occupied siding. Three or four crewmen were killed in that collision.
Then we will agree to disagree , and I will not belabor my points .
Ptc isn't even a gps based system like the media outlets are making it out to be.
There are three PTC systems that use GPS as a base. Jason