Human error, ouch. It sounds like someone forgot to line and lock all switches in the normal position before they went home for the day.
unless that system also senses the position of siding switches which are usually not connected to the dispatcher's panel.
. I am so tired of this argument. Japan’s is the size of California and France (the largest country in Western Europe) is the size of two Colorado’s. The scale of size and economies between the two makes this argument ridiculous and uninformed. Just for a simple argument, imagine if 2-3 midwestern states could utilize 100% of federal tax dollars instate because they were their own sovereign country, especially if they could subsidize their national defense to the rest of U.S. like most of the free world does.
No light signal? What are you talking about?
A temp signal triggered to the turnout then wired to place that can be seen by the crew of on coming trains .
Adam, please correct me if my "old practices" knowledge is out of date here. From what I'm reading so far, this is a "perfect storm" of errors and inattention:Crew from CSX train apparently left switch diverging. Whether this was properly communicated to the DS would be a matter of reviewing radio recordings.Signal reported "down for maintenance", which is completely different from "not operating". If taken out of operation it is possible heads were turned, which is to be read as not governing movement. If simply not operating and therefore dark, it would then invoke stop-and-proceed-at-restricted-speed per rules.The siding switch would normally throw a shunt across the rails if the siding track is not separately signaled and the switch is thrown diverging, resulting in a "stop" indication for the block. That it is alleged it was thrown and locked indicates that it was a non-signaled siding.The shunt should have caused an "approach" to be displayed at the previous signal......provided that the reason for "down for maintenance" did not also affect signal system communications. It is possible that the "down" could be problems in the cabinet and not with the signal itself, and the block (and shunt) were not being detected to pass the occupancy down the line.DS (evidently) gave instruction to the Amtrak head-end regarding maintenance issues at this signal and to expect it to be offline (turned heads), which is different than "ignore the inoperable signal," where rules would dictate "stop-and-proceed, etc."There's too much we don't know and won't know until the NTSB review. My stomach sunk when I read of this accident, as unfortunately it is shades of a similar accident we had on the SP around 1970. A maintainer "temporarily" jumpered a relay in the cabinet, resulting in a "clear" on the main when the siding switch was diverging into an occupied siding. Three or four crewmen were killed in that collision.
Yes, but the density of passenger rail traffic in either of those likely exceeds US passenger service. As for the last part, so let's cut military spending then (and give it to Amtrak) and draw back to our own borders. Never heard of pink slips being handed out to military though, but it might be interesting because we will then need to downsize military staffing. Whoops, there goes the unemployment rate, up, up. Of course, all of the US military hardware manufacturers will love the spending spree caused by the arms escalation that occurs in the US's vacuum. And the media will have a field day with the stand-offs that occur soon after, and the new world order that results. а ты говоришь по русски?
Thats why we have signal systems. It's to give trains time to stop before reaching the problem. A light at the switch would have maybe helped but with the trees abd the curve, who knows how far his sight distance was.They used to have lanterns on the switch stand but a signal system is safer.
I would love to see the government fund Amtrak the same way the do all the other transportation modes. It is a crime that they don’t. I am also in favor of a larger military.
NBC News was reporting this evening that the train control signals were down while CSX installs PTC on that section of track, and that the Dispatcher gave the Amtrak crew clearance to proceed. Train speed was reported as 51 mph.So, besides the irony of PTC actually contributing to the cause of this wreck, there are still remaining questions as to why the Conrail crew left the switch set for the siding when leaving the train for the night, and why the Dispatcher did not know that or failed to act on the knowledge. The Amtrak crew seems to be not responsible for the tragedy (but still dead).
...there are still remaining questions as to why the Conrail crew left the switch set for the siding...
Exactly. And, correct me if I'm wrong, but isn't it the responsibility of the switching crew to re-set the derail to the derailing position, re-align the mainline switch and report that to the dispatcher? And, isn't it the responsibility of the dispatcher to ensure that this is carried out? I don't see how PTC would have prevented this accident unless that system also senses the position of siding switches which are usually not connected to the dispatcher's panel.Doug