Author Topic: PRR/Conrail Juniata Division Engineering Report  (Read 358934 times)

0 Members and 1 Guest are viewing this topic.

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #540 on: August 05, 2012, 09:47:21 PM »
0
Looks better already...

Bsklarski

  • Crew
  • *
  • Posts: 673
  • Gender: Male
  • Respect: +6
    • B&M Conn River Line
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #541 on: August 05, 2012, 09:55:57 PM »
0
Since you are going to replace a little bit of the track to code 55................ :D
Brian Sklarski
Engineer, New England Central Railroad

https://www.facebook.com/pages/Boston-Maine-Conn-River-Line/173358446076160

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26027
  • Head Kino
  • Respect: +11442
    • Conrail 1285
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #542 on: August 05, 2012, 10:38:50 PM »
0
Yep, I like the factory so much better than the mine.

Dave V

  • Crew
  • *
  • Posts: 12191
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11574
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #543 on: August 05, 2012, 11:12:33 PM »
0
Agreed.  Now I just have to figure out which of the awesome kit bash options DKS came up with will work the best.  Honestly, I really like the Middlesex Manufacturing look because it is so old-looking versus some of the more modern structures.

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #544 on: August 06, 2012, 12:40:28 AM »
0
Now I just have to figure out which of the awesome kit bash options DKS came up with will work the best.  Honestly, I really like the Middlesex Manufacturing look because it is so old-looking versus some of the more modern structures.

I don't think any of these recommended buildings look the slightest bit modern, unless you think the right half of the prototype building looks "modern" (that style has been around since the early 20th century).



Top left is the DPM Hilltowne Hotel; bottom left is the Walthers Redwing Milling; bottom right is the Cornerstone American Hardware Supply, although that could be replaced with a number of similar Cornerstone kits. The little guy at center right is entirely optional; in hindsight, probably unnecessary.
« Last Edit: August 06, 2012, 12:46:57 AM by David K. Smith »

Dave V

  • Crew
  • *
  • Posts: 12191
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11574
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #545 on: August 06, 2012, 10:49:28 AM »
0
Interesting how that one section appears like curtain wall but no concrete is visible like on the model.

The whole factory IRL appeared to be (and still does appear to be) brick red.

John

  • Administrator
  • Crew
  • *****
  • Posts: 13990
  • Respect: +4172
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #546 on: August 06, 2012, 02:17:59 PM »
0
I think I would try cardstock and brick paper ... thats a small fortune in kits

Dave V

  • Crew
  • *
  • Posts: 12191
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11574
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #547 on: August 06, 2012, 03:41:06 PM »
0
I'm thinking that American Hardware Supply is too wide (deep) for the space.  I will have to trim it (and possibly lower it).  The DPM store, even if I paint it brick just isn't doing it for me.

I will definitely pick up a Walthers smokestack for this one.

Dave V

  • Crew
  • *
  • Posts: 12191
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11574
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #548 on: August 06, 2012, 07:35:52 PM »
0
Okay, I can probably illustrate why I'm focused on the very early architecture.  The factory you see in Huntingdon today is only about half of the original facility; the presumably older portion was closer to the mainline, and according to my sources lasted at least until 1975. 

So you can see the factory was an even more eclectic mix of architectural styles and sprawled over even more real estate.

The kit bash plan above does a fine job of representing the extant portion, but the older portion that earlier Pennsy fans would know is closer to the Middlesex Manufacturing kit and/or the Kibri kit:

http://www.hobbylinc.com/htm/kib/kib7223.htm

As an aside, here's a neat "Americanized" version of the Kibri kit:

http://www.irwinsjournal.com/wny/wny2007.11a.jpg

« Last Edit: August 07, 2012, 09:54:44 AM by Ian MacMillan »

Zox

  • Crew
  • *
  • Posts: 1120
  • Gender: Male
  • Respect: +2
    • Lord Zox's Home Page
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #549 on: August 06, 2012, 11:36:43 PM »
0
Eventually, I'll be doing this building:



So I'll be looking forward to any hints/tips/tricks you can provide. Or if I come up with anything in a reasonable timeframe, I'll pass on my experiences.
Rob M., a.k.a. Zox
z o x @ v e r i z o n . n e t
http://lordzox.com/
It is said a Shaolin chef can wok through walls...

One of One-Sixty

  • Crew
  • *
  • Posts: 1304
  • Respect: +3
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #550 on: August 07, 2012, 07:03:26 AM »
0
I don't think any of these recommended buildings look the slightest bit modern, unless you think the right half of the prototype building looks "modern" (that style has been around since the early 20th century).



Top left is the DPM Hilltowne Hotel; bottom left is the Walthers Redwing Milling; bottom right is the Cornerstone American Hardware Supply, although that could be replaced with a number of similar Cornerstone kits. The little guy at center right is entirely optional; in hindsight, probably unnecessary.

HAve you thought about CMR, they have several buildings that can match the front, the only problem I can see is shelling out the $$ just to use maybe 1 or 2 sides from the whole kit.
“My deeds must be my life. When I am gone, they will speak for me.”- Stephen Girard

Modeling a modern Pennsylvania Railroad 1996-Present

Chris333

  • Crew
  • *
  • Posts: 19486
  • Respect: +6771
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #551 on: August 07, 2012, 07:16:48 AM »
0
I say draw it as close as you can and then... Monster Model Works  ;)  This way you can have exactly what you want.

http://www.model160.com/n-scale-news-blog/photo-of-the-week-chris-brimley/

Chris333

  • Crew
  • *
  • Posts: 19486
  • Respect: +6771

Dave V

  • Crew
  • *
  • Posts: 12191
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11574
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #553 on: August 07, 2012, 10:05:12 AM »
0
Thanks for those pics, Chris!

Hard to find online shots of the older, more Middlesex-esque portion of the building from Pennsy days online.

Dave V

  • Crew
  • *
  • Posts: 12191
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11574
Re: PRR/Conrail Juniata Division Engineering Report
« Reply #554 on: August 07, 2012, 10:32:41 AM »
0
The older portion of the factory I want to model is just visible over the F40PH and first Amtoob in this 1988 photo:

http://www.railpictures.net/viewphoto.php?id=75994