0 Members and 1 Guest are viewing this topic.
I follow this protocol...Room ShapeBenchwork plan (to establish available space)Rough route planAddition of critical LDE'sRefined route planStart constructionfinalized track plan...based on actual physical plant restraintsReview and revise based on operational experience.Buy beer, run trains.
Quote from: asciibaron on January 11, 2010, 08:31:06 AMi have built about 14 layouts over the years - i know exactly what i want.Sorry, this is a contradictory statement.
i have built about 14 layouts over the years - i know exactly what i want.
I follow this protocol...Room ShapeBenchwork plan (to establish available space)Rough route planAddition of critical LDE'sRefined route planStart constructionfinalized track plan...based on actual physical plant restraints
Quote from: sizemore on January 11, 2010, 08:22:41 AMAlways with the negative waves Moriarty, always with the negative waves.... Proper planning prevents poor performance.heck, the prototype has operational problems that it has to sort out and sometimes that means reconfiguring an interlocking or reducing a grade, or reversing a crossover.
Always with the negative waves Moriarty, always with the negative waves.... Proper planning prevents poor performance.
well, when i'm constantly the punchline regarding my lack of a layout, the distinct needs to be explained.
i think Dave [Vollmer] is starting to see what he really wants from a layout and why his current layout is missing that mark. having that understanding is helpful, but also removes a bit of the "innocence" of model trains. knowing what you want can become a burden.
2. The bridge over Codorus Creek between York and Emigsville is a natural scene to model:...although Bing Maps shows concrete piers have replaced the stone.
So then technically you really only had one layout with 14 revisions ;D. Go cut some wood man and stop bike riding!
"Hi, guys, remember me? I was the original topic of this thread. I'm the Harrisburg-York line. ;D"
With the decline in rail passenger and freight service in the 1950s, accelerated by completion of the Baltimore-Harrisburg Expressway (I-83), the "Parkton locals" were dropped in 1959 and the line was reduced from double-track to single-track. Some long-distance trains, such as the General to Chicago and the Buffalo Day Express, continued to operate until the late 1960s. In 1972, when Hurricane Agnes caused bridge damage and washouts along the line, it ceased operations completely. One of the oldest rail lines in the country, it had run for a total of 134 years.
Quote from: sizemore on January 11, 2010, 11:13:31 AMSo then technically you really only had one layout with 14 revisions ;D. Go cut some wood man and stop bike riding!i fear the cold has frozen your gray matter
Quote from: Dave Vollmer on January 11, 2010, 11:12:38 AM"Hi, guys, remember me? I was the original topic of this thread. I'm the Harrisburg-York line. ;D"Harrisburg to York is not included in the NCR correct? This was the information I found on the NCR about single versus doubletrack from Wikipedia: The S.
True enough... In fact, what is now the Mid State Farm Supply started as a small kitbashed Walthers feedmill from my previous layout. It was too tiny for rail service. However, I felt compelled to use it again. It never looked worthy of rail service until I expanded it to include the farm store.