Well, Ian, you're right about the C55 thing. But, I think that if we built a big enough block of modules with it, it might be a catalyst for change. Additionally, I think that in my own experience, the infrastructure exists down here for a "Code 55 division". Right now it's all onetrak, but that doesn't mean it has to be.And as far as track spacing, I think we can figure out a way around that, especially if we go with the looser BANTRAK Onetrak specs.Phil has hit the nail ON THE HEAD about creating a new framework. I want no part in that.
Does my two-part Cassandra count as a filler? Or should I figure on 2' in each direction to get the joints in compliance?Lee
Quote from: wm3798 on July 15, 2009, 12:29:14 PMDoes my two-part Cassandra count as a filler? Or should I figure on 2' in each direction to get the joints in compliance?LeeIdeally in addition to the 8' of "scene", you'd do 8' of "nothing", like the stretch to the east or west. It could be super simple too. I'm not even thinking the "nothing" modules need to be wider than 12". They really are just filler.
Quote from: Ed Kapuscinski on July 15, 2009, 12:37:01 PMQuote from: wm3798 on July 15, 2009, 12:29:14 PMDoes my two-part Cassandra count as a filler? Or should I figure on 2' in each direction to get the joints in compliance?LeeIdeally in addition to the 8' of "scene", you'd do 8' of "nothing", like the stretch to the east or west. It could be super simple too. I'm not even thinking the "nothing" modules need to be wider than 12". They really are just filler.Modules about nothing - this is starting to sound like Seinfeld!
The modutrak guys have gotten lucky, but I don't trust luck. These are a good way to make up for unevenness, incorrect setbacks, electrical isolation, etc... as I said, this is years of experience speaking here.