TWELVE eight foot sections???!!! That'll be one impressive layout!
@daniel_leavitt2000 Do you have a locally based contingent of people you can count on to operate and more importantly help you stage operations for sessions?
Will the sidewalk extend across as well? If not, I don't know if I'd have made the road that wide?
What Dave did there is correct for a lot of locations. Certainly is for here. Concrete sidewalks stop at the tracks and the road asphalt is extended for a paved surface through the rails, then the concrete resumes.
Yeah, the sidewalk extends across. Here's the prototype crossing. ...
Interesting. In this case it must be done that way since it's an industrial spur and unlikely to be dug-up for periodic rail/tie maintenance. Asphalt-paved sidewalk areas are normal on mainline crossings where digging it up and then repaving is standard practice.
Yeah, the concrete panels serve the same purpose - removable for maintenance.