0 Members and 1 Guest are viewing this topic.
Pliobond deteriorates in a few years and becomes very stringy, use a fresh tube every so often.Kind regards,Bill
@robert3985 or anybody else. When laying track, not necessarily switches, do you use a product like Pliobond to glue the rail to the filler ties? Or some type of glue? I ask because my reading has suggested that Pliobond is great because it is easy to repair should it break loose for any reason (expansion/ contraction?) by just heating with a solder iron. When pondering that, a concern surfaces when using styrene ties with heat from a soldering iron. Anything to add?
I agree that the wooden ties between the PCB ties aren't needed to maintain gauge, but they do serve a useful purpose, besides appearance. A PCB tie every half to three-quarter inch will work fine, but you must be VERY careful cleaning the track, or you end up with vertical kinks.I found that out many years ago, when first experimenting with PCB ties for laying track. As it was just a test track, I didn't waste time or money on looks. Code 55 didn't have too many problems, but code 40 turned out to be surprising fragile under "normal" cleaning.I know, most people won't lay track with just PCB ties, but for hidden track it could save time, money, and effort.
With me however, I sand wooden ties after they and the PCB ties are glued down with yellow carpenter's glue to get the wooden ties to the same height as the PCB ties.... My Styrene ties on my turnouts are the same height already as the PCB ties,If you feel like you are compelled to glue your rails to your wooden ties, then buy Pliobond cement from Fast Tracks here: https://www.handlaidtrack.com/tools-adhesivesHowever, once again, I don't worry about it, and it works fine for me and eliminates an unnecessary step, making track laying go much faster.Cheerio!Bob Gilmore
Poliobond for me as well, sourced from FT with their application tip. I put a thin bead on the bottom of the rails and the top of the ties, let dry, press together (as with contact cement, as I believe FT recommends) and then apply heat. I lay the ties out on printouts of FT's turnouts using a thin strip of double sided crafters tape and, because I use the FT jig, it all fits together properly. However, recently I've been leaving out the 5 ties closest to the points because, no matter how hard I try, I find some Pliobond gets into places it shouldn't and interferes with the smooth movement of the point rails. After the switch is installed on the layout the missing ties can be slipped under the rails with a tiny bit of white glue to secure them to the roadbed. Geoff
As much as I like the FT system and their products, I do find the frets of PCB ties a little frustrating. The useable length of the tie pieces are only 1 3/8", which is too long for a single longer but not long enough for a longer and a shorter tie. This results in a lot of waste. Being charitable, I assume this has something to do with the ability of their milling machine to hold the fret together as its being milled. Ideally we could have ties strips, say, 12" long and almost no waste. The total width of the "oversized" PCB fret is 1 7/8". I have a good solid pair of flush cutting pliers that I use to cut through the fret material to cut tie strip the full 1 7/8" long (with a little filing to clean up). This lessens wastage substantially and improves the "completed turnouts per dollar of FT expenditure" ratio. Watch out for the off-cut bits though; they rocket across the room at the speed of light.Geoff