Author Topic: Weekend Update 9/2/18  (Read 9790 times)

0 Members and 1 Guest are viewing this topic.

craigolio1

  • Crew
  • *
  • Posts: 2738
  • Respect: +2388
Re: Weekend Update 9/2/18
« Reply #30 on: September 03, 2018, 07:01:35 AM »
0
A little progress report.

I pretty much have the mechanics worked out for the Lark club -- A little more tweaking ---





Thanks,
Wolf

That’s a neat looking model that I’ve never seen before.

Are those an existing model or sides/core/printed etc?

Craig

SP-Wolf

  • Crew
  • *
  • Posts: 834
  • Gender: Male
  • Respect: +2085
Re: Weekend Update 9/2/18
« Reply #31 on: September 03, 2018, 07:41:07 AM »
0
Wolf,
Progressing VERY nicely! What did you use for the diaghragms?
Thanks for the update!

Hey Mike,

The diaphragms are from Des Plains Hobbies. The trucks are from them as well (Sorry - the trucks can't be seen).



I am using M&R sides with American Limited core kits. I have has these for years --

Thanks,
 Wolf

Cajonpassfan

  • Crew
  • *
  • Posts: 5398
  • Respect: +1973
Re: Weekend Update 9/2/18
« Reply #32 on: September 03, 2018, 11:48:24 AM »
0
Hey Mike,

The diaphragms are from Des Plains Hobbies. The trucks are from them as well (Sorry - the trucks can't be seen).

I am using M&R sides with American Limited core kits. I have has these for years --

Thanks,
 Wolf

Nice work, Wolf! That's such a distinctive diner. Very nice!
I have a bunch of a old Roberto Martari's sides as well. Someday when I have time...  :facepalm:
Otto

SP-Wolf

  • Crew
  • *
  • Posts: 834
  • Gender: Male
  • Respect: +2085
Re: Weekend Update 9/2/18
« Reply #33 on: September 03, 2018, 05:51:44 PM »
+4
Some more progress.

Roof details have been added. - Next, the real pain -- under body details --






Thanks,
Wolf

Cajonpassfan

  • Crew
  • *
  • Posts: 5398
  • Respect: +1973
Re: Weekend Update 9/2/18
« Reply #34 on: September 03, 2018, 07:20:49 PM »
+7
I used the long weekend to make a bit of progress on my Cajon layout, working scenery and backdrop uphill from Verdemont toward Devore, about 6' worth around M.P 72.5. The backdrop is photo-based, but heavily photoshopped. Not as easy as it would seem at first, as I am learning the hard way... still, I like the results.
Otto K.

PGE_Modeller

  • Crew
  • *
  • Posts: 297
  • Respect: +20
Re: Weekend Update 9/2/18
« Reply #35 on: September 03, 2018, 07:30:05 PM »
0
Very nice, Otto!  What is the separation between decks in the last photo, please?

Cheers,

chuck geiger

  • Crew
  • *
  • Posts: 3565
  • Gender: Male
  • Train Talk Media
  • Respect: +3957
Re: Weekend Update 9/2/18
« Reply #36 on: September 03, 2018, 07:53:57 PM »
0
Ted York will dip the wings of a 737 for you Otto. Grand work.

robert3985

  • Crew
  • *
  • Posts: 3552
  • Respect: +1928
Re: Weekend Update 9/2/18
« Reply #37 on: September 03, 2018, 08:09:07 PM »
0
I used the long weekend to make a bit of progress on my Cajon layout, working scenery and backdrop uphill from Verdemont toward Devore, about 6' worth around M.P 72.5. The backdrop is photo-based, but heavily photoshopped. Not as easy as it would seem at first, as I am learning the hard way... still, I like the results.
Otto K.

Otto,  I like the results too!  Very nice...

Cheerio!
Bob Gilmore

SP-Wolf

  • Crew
  • *
  • Posts: 834
  • Gender: Male
  • Respect: +2085
Re: Weekend Update 9/2/18
« Reply #38 on: September 03, 2018, 08:50:08 PM »
0
@Cajonpassfan

Outstanding, Otto!!

The second photo looks like a "real" photo.

Wolf

Cajonpassfan

  • Crew
  • *
  • Posts: 5398
  • Respect: +1973
Re: Weekend Update 9/2/18
« Reply #39 on: September 03, 2018, 09:00:59 PM »
0
Very nice, Otto!  What is the separation between decks in the last photo, please?

Cheers,

Greg, Chuck, Robert, Wolf, thank you, much appreciated.
Greg, the lower deck vertical separation "window" at this point is only 8" between the bottom of the upper fascia and the lower deck scenery. While less than ideal, it is the result of a "daylighted" helix, and the shallowness of the "window" is somewhat mitigated by the lower deck protruding forward; 12" vs. 8 1/2". Beats the heck out of running inside a helix....
Thanks for your interest.
Otto
« Last Edit: September 03, 2018, 09:06:47 PM by Cajonpassfan »

mighalpern

  • Crew
  • *
  • Posts: 278
  • Respect: +142
Re: Weekend Update 9/2/18
« Reply #40 on: September 03, 2018, 11:40:21 PM »
+2
So got fired up this last week to begin my "NP Green River Viaduct "



and got it compressed to about 5 feet and 6 towers instead of 8.
I found a really good drawing of the bridge and the terrain and started gluing the rough pieces in and then this weekend I got to the rasp and gave it an initial shaping.




I wanted to create the double track bridge but found that it was going to be a lot of scratch building to get there, so I went with plan "B" and will have switches at the ended.  So with that in mind and trying to keep things as light as possible I am going to glue a thin veneer of wood in the square cut out, so I  can then screw and secure a tortoise motor .  So thats the plan



I have 1 bridge kit and that will span the middle, need to order another 2 kits.
Anyway just the beginnings to keep my drive and hopefully my future layout going.
Later

Miguel


ncbqguy

  • Crew
  • *
  • Posts: 624
  • Gender: Male
  • Respect: +387
Re: Weekend Update 9/2/18
« Reply #41 on: September 04, 2018, 12:06:28 AM »
0
You could make it a gauntlet track across the bridge.   It would eliminate the two switch machines.   If you have a couple of turnouts with bunged up points they could be used to make the approaches (don’t know what the technical term is for the frog without the “switch” is).
Charlie Vlk

mighalpern

  • Crew
  • *
  • Posts: 278
  • Respect: +142
Re: Weekend Update 9/2/18
« Reply #42 on: September 04, 2018, 12:59:39 AM »
0
Charlie:
Interesting idea.
  I might have to whip one up and see how reliable it is.  I have made multiple N scale turnouts, and this doesn't look any harder.
thanks for the alternative.  very neat
Miguel

chuck geiger

  • Crew
  • *
  • Posts: 3565
  • Gender: Male
  • Train Talk Media
  • Respect: +3957
Re: Weekend Update 9/2/18
« Reply #43 on: September 04, 2018, 12:58:47 PM »
+7
Working on Ponderosa siding on the BNSF Ponderosa Subdivision. Tile grout for dirt over track and waiting for Blair Line loading ramp for mountain siding which will serve Ponderosa which is just over the ridge. Also waiting for 4-6" pines for thee front and 2-3 inches in the back. Trees will populate foreground around the siding and the service road. On vacation this week and knocking out some modeling.



« Last Edit: September 04, 2018, 01:02:37 PM by chuck geiger »

Blazeman

  • Crew
  • *
  • Posts: 1306
  • Respect: +65
Re: Weekend Update 9/2/18
« Reply #44 on: September 04, 2018, 01:00:12 PM »
+1
Working on Glyndon area of my layout.  More info in the Layout Engineering section



Visited Dave Hughes WM (HO) layout just down the tracks from there the other week. In his case, his layout includes that stretch of line in his back yard.  MM crews now and then, when they have time, will park the train and walk over to check out his rendition of the railroad they're operating.