0 Members and 3 Guests are viewing this topic.
Here's a shot that shows how I'm transfering the layout design to it's physical form.I print out the track diagram full size (I'm using Anyrail, but SCARM can do this just as well), tape it down, use a pounce wheel to emboss centerlines, then (I often go over the centerline with a Sharpie to make it more obvious), then lay roadbed.One thing I've (re-)learned the hard way - paper stretches as it goes through a laser printer, and not consistently, so dimensions aren't exact and vary a little from page to page. Some printers and some papers are more dimensionally stable than others - my current printer and paper aren't great in this regard.In any event, even with perfect printouts, minor adjustments are necessary to get everything lined up.
Nice. What paper size are you printing to?
Here's something I learned the hard way also and it might be the reason your prints are off a bit: When you set your graphic to print at 100% (meaning the actual size as designed) it can be off a tad depending on the printer used. Brother laser printers do this, for example. At least mine does. If you go into your graphics software and design a 10 cm ruler (or 5 inches) and print it at 100% from the PDF or vector file (SVG, etc)-- you can check it against a real ruler and figure out the % of distortion and compensate for it in the design. It's not going to be much, but it can make a difference as you found.Jesse
Now that I'm laying roadbed, I'm considering what to do with secondary track..I'm using 1/8" cork roadbed on mainlines, etc.I'm leaning towards putting siding right down on the ground (no roadbed), to give a little visual distinction. Bonus is that cars won't roll up onto the main.I'm not at all sure what to do with yard and service tracks. One thought is to put the classification yard tracks on the ground (and buried in questionable ballast) but keep busy service tracks up at the same level as through tracks. Or I can fake it but just putting a big sheet of 1/8 cork down under the yard.Any suggestions or references?
Use 3/4” 3m double stick tape. It’s about 3/32” thick so the transition from main to spur won’t be that bad. Use a utility knife to slice the roll in half, width wise. Then unfurl the uncut edge along your centerline, and then butt the other uncut edge and follow the first. Use some cork to transition from the switch mainline height down to the tape. Lay down your track and peel the backing from the two halves as you go, pressing the ties to the tape. After the track is secure, drag an exacto along the ends of the ties, slicing the excess tape and peel it away for ballast down to your landform. This is the DKS method I used on my layout, the ballast glue will secure everything in the end.
There seem to be several different versions of "3M double-stick foam tape. Which did you use?
I use one strip of Midwest HO cork for my mainline tracks and NScale cork for sidings and yards.