0 Members and 1 Guest are viewing this topic.
I have one of those (unbuilt). One of these days I'll make some decals for it and get it built. I'm thinking of making a master pattern and resin casting the the cylinder ends. Another project waiting for a round tuit.
I would highly recommend working on a ceiling while waiting for the track. I would hate to see a shower of dust on your creation.
Attended the TRAINS '13 show in Burnaby, BC last weekend. The PGE/BCR Modellers group had a very nice display with lots of static models and a running layout in N-Scale and very nice HO display table as well. Present were Railwire members Tim H., Greg K, Paul C-S, Bob D. Chris D., and also David M., Nolan and Mike M. I took the risk and carried two models down on the plane for display.One of the GF6C electric locomotives used by the BCR on the Tumbler Sub.Thought I'd spruce up one of the Atlas LNT900 Ford tractors to go along with the Motorways trailer.Tim H. took these photos of the overall display.Doug
Don't bother - it won't happen. Jeff likes his layout room "in the raw".
George, I'm curious...did you thin the TruColor paint with anything?
Nice looking cars, George, but what happened, the air in Portland got you building NP not NKP ??Greg O.
Doug. I have a couple of those electrics on my to do list (which is a very long list, but a list no less) and I would love to see more of the process. Perhaps others would as well? Did you take pictures through out? Would you concider a build thread? At the very least, please tell us which chassis did you use and how did you fit it, and how can I get a set of the British Columbia Railway decals?They look incredible!Thanks, Craig
I know you all want me to do the ceiling but I don't be leave it is needed. Growing up I had my layout in the basement without a finished ceiling and I never had a dust problem. also that was a 50 year old house with old school flooring (1x6 boards) my new house is only 6 years old with plywood flooring so less seams to drop dust. I also have Hepa air filtration in this house so I don't see there being a problem.
Exposed concrete foundation and exposed joists with a floor on which people walk will still generate dust. HEPA filtraton or not. But is is not just that. Finished layout room also makes the experience of operating a model train layout much more pleasant. How do I know? I've visited and operated many layouts, in finished rooms/basements, and in unfinished rooms/grungy basements. But you have made up your mind anyways (and the layout is quite far along already).
And I've had the exact opposite experience. In fact, I've enjoyed operating on unfinished rooms more then finished because every one of the finished layouts also had valences and fascia painted dark colors. I felt like I was in a submarine while operating. It makes the layout feel smaller. Ultimately, it's a personal choice and every home owner has different needs with regards to their layout space both for the layout and perhaps post-layout utilization,Phil
I have another one to do and I plan on documenting the build for that one. A lot of trial-and-error on the first one so hopefully the second one will go much smoother.Doug