0 Members and 2 Guests are viewing this topic.
I believe modern DPU service would remain with the train for its entire journey, while helper service in the SP era, locos would be cut-in mid-train at Bena and removed at Summit.
I have a video of this operation in the 1990s on Rio Grande/SP Tennessee Pass line where pretty much every train had helpers. At the summit, they stop, cut the train and move the helpers out. It seems like a long process, facilitated by the presence of a short house track at the summit. A block of tunnel motors or some AC units, depending on what the train was.
I'm pretty sure I could add another 10 cars without too much trouble (...) but I would definitely need another unit somewhere.
One thing I have definitely noticed is that it's counter-productive to use multiple units at the head end if they're not decently speed matched. They tend to fight each other rather than pull the train. I'm hoping DCC speed matching will help that situation. In the meantime, I have enough units to pick & choose for match.
* jb, on the prototype, I tend not to see dupes on auto-rack trains, and often not on inter-modals either.
Way back in May, I posted a similar video of the first train on the Loop: a 14' rack train with no dupes. (Temprary track and wiring at the time.) Fortunately, there was no sign of the cars wanting to string-line then, and that's close to the longest train I'd run in a session. Much longer than that starts to visually dominate the layout. So I will probably run the racks and most inter-modals with only head-end power. I'm a little concerned about running a lot of racks down grade with truck-mounted couplers and lo-pro wheels - will have to try that soon.
I've seen DPU units on the rear of UP intermodals headed into the Port of Oakland. Usually just one on the end.