0 Members and 1 Guest are viewing this topic.
That bridge is awesome.The N scale layout looks pretty awesome too. Similar concept to my club's HO layout, which is designed to spread over 6 decks over 3 separate aisle levels.http://www.wrmrc.ca/divmap.html
I worry about operators getting bored and cranking the throttle to speed the process on a 4 or 5 turn helix. ;D
The Helix From HellHelix M, the largest on the layout, consistsof thirty-nine (39) revolutions of whichabout twenty are double track and aboutnine are triple track. The triple track sectionadds an additional outer track to getbetween Levels #3 and #2. The doubletrack section runs from top to bottom allowingtrains on the top level to run all theway down to Level #1.
Maybe ten levels are single track...
The doubletrack section runs from top to bottom allowingtrains on the top level to run all theway down to Level #1.