Author Topic: Weekend Update 4/24/11  (Read 12061 times)

0 Members and 1 Guest are viewing this topic.

up1950s

  • Crew
  • *
  • Posts: 9956
  • Gender: Male
  • Respect: +2871
Weekend Update 4/24/11
« on: April 23, 2011, 06:47:32 PM »
0
How come kids don't throw eggs at Easter ?

/>
Ehaaaaa what's up Doc ?


Richie Dost

up1950s

  • Crew
  • *
  • Posts: 9956
  • Gender: Male
  • Respect: +2871
Re: Weekend Update 4/24/11
« Reply #1 on: April 23, 2011, 06:51:06 PM »
0
Next is rotator cuff micro surgery , then pain ,  then 105 gets painted .


 


Richie Dost

SirTainly

  • Crew
  • *
  • Posts: 1785
  • Gender: Male
  • Respect: +93
Re: Weekend Update 4/24/11
« Reply #2 on: April 23, 2011, 08:57:11 PM »
0
You've done an outstanding job on that loco, hope the surgery goes well and your recovery is speedy!

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: Weekend Update 4/24/11
« Reply #3 on: April 23, 2011, 09:18:30 PM »
0
Finished the industrial siding on the Z Scale G&D--
 

 

 

BCR 570

  • Crew
  • *
  • Posts: 2468
  • Gender: Male
  • Respect: +5001
    • BCR Dawson Creek Subdivision in N Scale
Re: Weekend Update 4/24/11
« Reply #4 on: April 23, 2011, 09:41:04 PM »
0
My RS-10 and RS-18 locomotives have returned to service with new TCS M4 decoders and independent front and rear lighting installed by my friend Dave Mackinnon at www.detailsnscale.com.  Here is RS-10 581 with 584 trailing:




Here is RS-18 613 with 607 trailing:




And here are RS-10s 581 and 584 at night:




I also began assembly of a GHQ front end loader this week.


Tim
T. Horton
North Vancouver, B.C.
BCR Dawson Creek Subdivision in N Scale
www.bcrdawsonsub.ca
https://www.youtube.com/channel/UC3MbxkZkx7zApSYCHqu2IYQ

Philip H

  • Crew
  • *
  • Posts: 9024
  • Gender: Male
  • Respect: +1793
    • Layout Progress Blog
Re: Weekend Update 4/24/11
« Reply #5 on: April 23, 2011, 10:17:49 PM »
0
No modeling this week - the teenagers were here for spring break so we did. Lot of dad-daughter stuff. And tomorrow we'll do Zeaster as a full family for the first time in about 5 years.
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


up1950s

  • Crew
  • *
  • Posts: 9956
  • Gender: Male
  • Respect: +2871
Re: Weekend Update 4/24/11
« Reply #6 on: April 23, 2011, 10:31:04 PM »
0
You've done an outstanding job on that loco, hope the surgery goes well and your recovery is speedy!

Thank you Sir , looking forward to have that arm pain free while I model , it was 10-18-2010 when I tore it fairly bad , 3.8 and 1.8 cm's ,  in 2 places .
« Last Edit: April 24, 2011, 09:17:22 AM by up1950s »


Richie Dost

eric220

  • The Pitt
  • Crew
  • *
  • Posts: 3738
  • Gender: Male
  • Continuing my abomination unto history
  • Respect: +648
    • The Modern PRR
Re: Weekend Update 4/24/11
« Reply #7 on: April 23, 2011, 10:37:59 PM »
0
Well, after a too-long absence, I am back with news.  My harebrained ideas are coming to life!  Construction began this week on what will become the Pennsylvania Railroad!  My parents were in town, and I managed to recruit a little help from a friend, so we got a fair amount of work done.  Construction began with the peninsula that will hold Newark on one side and Panther Creek on the other.



It seemed like we spent quite a bit of time problem solving, or even just generally brainstorming about the best way to do things.  One solution that we came up with that I felt was somewhat creative was the supports for the staging level along the south wall.  We could have done this with legs and more conventional table construction, but the techniques that we used for the staging level can be directly translated to the lower level 7 inches above, as well as the upper level.



And by that night, most of the base for staging was in, as were supports for the other two levels.  I find it somewhat ironic that we began construction with the staging level, which is the area that received the least design attention of all.  We decided to do staging for two reasons.  First, parts of the lower level are going to have to be supported off of the staging level.  Second, laying track is going to be a heck of a lot easier without the lower level creating severe vertical space constraints.



And of course, a great big thanks to my faithful cleanup servant.

-Eric

Modeling a transcontinental PRR
http://www.pennsylvania-railroad.com

SkipGear

  • Crew
  • *
  • Posts: 2431
  • Gender: Male
  • Respect: +647
Re: Weekend Update 4/24/11
« Reply #8 on: April 23, 2011, 11:19:31 PM »
0
It's not N but this turned out so good I wanted to share....

...from the HO layout that I am helping with.
 
The movie theater is hopping tonight...
 

 
Tony Hines

Chris333

  • Crew
  • *
  • Posts: 19562
  • Respect: +6861
Re: Weekend Update 4/24/11
« Reply #9 on: April 23, 2011, 11:20:37 PM »
0
I started playing with a Nn3 2-6-0. Stock Z scale Marklin's are kind of fast even if you get one with a 5 pole motor. Plus the gear ratio is only 26:1. So I put in a new motor and gave it a higher ratio. I used a 6volt 6x12mm motor that usually mounts like this:
http://www.nigellawton009.com/Marklin8805remotored.jpg
But i inverted it, then milled a well into the frame to sink the motor down. Next I soldered 2 tubes together to mount a lay shaft to the motor:




With the new reduction the ratio is now 83.7:1. I tested it in my hand and it runs smooth, can't wait to see it going down rails.

up1950s

  • Crew
  • *
  • Posts: 9956
  • Gender: Male
  • Respect: +2871
Re: Weekend Update 4/24/11
« Reply #10 on: April 23, 2011, 11:46:57 PM »
0
Nice to hear you milling now Chris .


Richie Dost

up1950s

  • Crew
  • *
  • Posts: 9956
  • Gender: Male
  • Respect: +2871
Re: Weekend Update 4/24/11
« Reply #11 on: April 23, 2011, 11:52:14 PM »
0
Tony that movie house is a glowing success . Even though it's HO , it doesn't get that good without special talents .


Richie Dost

wm3798

  • Crew
  • *
  • Posts: 16551
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7433
    • Western Maryland Railway Western Lines
Re: Weekend Update 4/24/11
« Reply #12 on: April 24, 2011, 12:09:32 AM »
0
Here's the week's progress...


Time to start wiring... fan tracks first, then about 100 LED's.

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2098
  • Respect: +219
Re: Weekend Update 4/24/11
« Reply #13 on: April 24, 2011, 01:51:37 AM »
0
It's not N but this turned out so good I wanted to share....

...from the HO layout that I am helping with.
 
The movie theater is hopping tonight...
 

 


hotttttt
"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2098
  • Respect: +219
Re: Weekend Update 4/24/11
« Reply #14 on: April 24, 2011, 02:01:42 AM »
0
went from this


to this


however i can't take credit...  DF can


and of course, Tim worked on Bellevue


and John automated Grutzmacher Orchard


all this was the fruits of hard labor...seen here
https://picasaweb.google.com/SeussCaboose/Apr242011?authkey=Gv1sRgCPn77cqN5NS9mwE&feat=directlink
"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook