0 Members and 1 Guest are viewing this topic.
Dammit. Some of us have work to do, you know...
Form follows function on the operations based model railroad. There's actually room for 6 or more 55 t cars. Haven't sized it with 70T cars yet... ;D@Ed, yes it does. It's a curvy railroad built for tonnage, not for speed. When I model the NEC, I'll be sure to mend my ways!Lee
You're sure accommodating Lee.
Shortened tail track. I got out the 70 tonners, and this is the limit for 5, with about a quarter inch between the last one and the switch points.My plan is to build the abutment to about 3" in height, then taper the hill down to the Connellsville line track. The switch back tail is about 2" below the main line grade, so this would blend into that without a lot of problems. There will be a highway on the inside of the tail track curve, which will cut under the big bridge, or may cross the tail track. Not sure yet. After I get the switchback area wired, I'll start cutting foam and see what we have here.Lee