Author Topic: Weekend Update - 11-22-2009  (Read 10655 times)

0 Members and 1 Guest are viewing this topic.

flight2000

  • Crew
  • *
  • Posts: 795
  • Gender: Male
  • Respect: +370
Re: Weekend Update - 11-22-2009
« Reply #15 on: November 22, 2009, 03:29:18 PM »
0
I just finished up these this weekend.  Not prototypical, but I like what I like in this case.... ::) ;D

I feel silly telling on myself, but during the decaling process, I got the cabs screwed up. 3468 was supposed to be the NS number.  It's not a simple change either because the NS model is a nose headlight version and the HLCX is the cab headlight.... ooops.... :-\

Brian


« Last Edit: November 22, 2009, 03:31:00 PM by flight2000 »
I've never met a covered hopper I didn't like.... :)
My (HO) NW Ohio Layout Feed: https://www.therailwire.net/forum/index.php?topic=57633.msg793742#msg793742

eric220

  • The Pitt
  • Crew
  • *
  • Posts: 3738
  • Gender: Male
  • Continuing my abomination unto history
  • Respect: +648
    • The Modern PRR
Re: Weekend Update - 11-22-2009
« Reply #16 on: November 22, 2009, 05:49:48 PM »
0
I didn't get any modeling done, but I did make some purchases.



Gah, why are there Rapidos on my layout?

Unfortunately, I have finally found a model that really dislikes that 9.25" radius curve.  The HHP-8 does fine, but the Acela Express slows to a crawl and the end business car jumps the tracks.  I need that new room!

PS - Anyone who wants an HHP-8, MB Klein is having a sale.  $50!
-Eric

Modeling a transcontinental PRR
http://www.pennsylvania-railroad.com

Zox

  • Crew
  • *
  • Posts: 1120
  • Gender: Male
  • Respect: +2
    • Lord Zox's Home Page
Re: Weekend Update - 11-22-2009
« Reply #17 on: November 22, 2009, 07:24:57 PM »
0
Nothing worth taking pictures of this week--I've been making up a whole bunch of sidewalk and curbing pieces for my bridge module. The hope is that, once I get all the little bits made up, the process of assembling them with the road section will go quickly.

All the books and magazines talk about how scenery is easy and sloppy and imprecise and "you can't make a mistake." So why is it that when I try to do scenery, I end up having to measure things in thousandths of an inch?

Apparently I'm not doing scenery, I'm doing scratchbuilt structures that just happen to be 18 actual inches long and six scale inches tall...  :)
Rob M., a.k.a. Zox
z o x @ v e r i z o n . n e t
http://lordzox.com/
It is said a Shaolin chef can wok through walls...

tehachapifan

  • Crew
  • *
  • Posts: 3470
  • Respect: +1145
Re: Weekend Update - 11-22-2009
« Reply #18 on: November 22, 2009, 07:49:32 PM »
0
I mounted Flexicoil sideframes on my kitbashed SW1500.......



Russ

sirenwerks

  • Crew
  • *
  • Posts: 6027
  • Gender: Male
  • Respect: +506
Re: Weekend Update - 11-22-2009
« Reply #19 on: November 22, 2009, 08:11:38 PM »
0
Russ, the SW1500 looks great.
Failing to prepare is preparing to fail.

sizemore

  • The Pitt
  • Crew
  • *
  • Posts: 2779
  • Respect: +144
Re: Weekend Update - 11-22-2009
« Reply #20 on: November 22, 2009, 08:26:54 PM »
0
Got a lot done this weekend, for starters I got the GPW out for a bit for a holiday charity event (www.thegobblefest.com). Also in doing some work on the GPW I found I might have a headgasket blown which is no big deal just a bummer. Otherwise I was able to determine what I'll need for the full restore next summer.  

Finished converting the Walthers bridge to a completely concrete styled bridge and also got it painted. I also painted BYR's Tool Car (an MT RPO), just have to make decals now. And to finish up the week I started decaling LRV GP-20's.

The S.

Thompson Sub: Instagram | Youtube | Website

SAH

  • Crew
  • *
  • Posts: 1297
  • Respect: +1918
Re: Weekend Update - 11-22-2009
« Reply #21 on: November 22, 2009, 08:32:43 PM »
0
A great week and weekend for me model RR wise.  On Saturday I ran at Bruce Faulkner’s CSX Shenandoah Division.  This layout runs as well as any layout in any scale.  There will be an article in MRP2010.  Until then see more here:

http://www.shendiv.com

Today I continued making progress on the AC&Y Spencer to Litchfield layout.  See that thread for photos and descriptions.

Steve
Steve Holzheimer
Lakewood, OH
Modeling the AC&Y Spur 4 Serving the Tire Industry

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26062
  • Head Kino
  • Respect: +11543
    • Conrail 1285
Re: Weekend Update - 11-22-2009
« Reply #22 on: November 22, 2009, 10:00:33 PM »
0
Moved yesterday with the generous help of our own NandW. Still getting settled, but it looks like everything survived.

Jim Starbuck

  • Crew
  • *
  • Posts: 1061
  • Respect: +3133
Re: Weekend Update - 11-22-2009
« Reply #23 on: November 22, 2009, 10:01:09 PM »
0
Installed a few decoders in engines we got at Trainfest so we could run them at our club open house this weekend.
Also installed a decoder and lighting in one of the Erie Builts I painted a few years ago. We programmed one of the LEDs for a Mars light which worked well.
I shot a fuzzy video of the engine and effect but haven't a clue as to how to post it. ???
Modutrak Iowa Division
Modutrak.com
Better modeling through peer pressure

davefoxx

  • Crew
  • *
  • Posts: 12336
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8562
Re: Weekend Update - 11-22-2009
« Reply #24 on: November 22, 2009, 11:04:33 PM »
0
Forum,

I made some major progress on my layout this week by roughing in the final landforms.  In the first picture below, which was posted last Sunday, you can see the far corner of the layout had a cut in both corners.  But once that was completed, something just bothered me.  I then realized that the layout seemed to have a dome in the middle.  As the second photograph shows, I solved this by continuing a ridge off the far corner and adding a tunnel.  Not only should this make the layout more interesting to railfan, but this should also make it seem larger.  As you can see, the road has also been roughed in since last week.  In case you were wondering, I was smart enough to ballast the track in the tunnel before gluing the roof on.  ;D







Happy Thanksgiving!
Dave Foxx
« Last Edit: November 22, 2009, 11:07:50 PM by davefoxx »

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

Mark5

  • Crew
  • *
  • Posts: 11858
  • Always with the negative waves Moriarty ...
  • Respect: +932
Re: Weekend Update - 11-22-2009
« Reply #25 on: November 22, 2009, 11:54:28 PM »
0
busy weekend - not much in the way of trains ...

I did order a W-3 cab and various steam detail parts from RLW for my E2a project.

Mark


brokemoto

  • Crew
  • *
  • Posts: 1290
  • Respect: +296
Re: Weekend Update - 11-22-2009
« Reply #26 on: November 23, 2009, 04:43:39 AM »
0





My first contribtion to Weekend Update.  I don't model the Rio Grande, but I bought this bumblebee MDC 2-8-0 at a Timonium Show for forty bananas.  I wanted a caboose to go with it.  This is a Bachpersonn UP four wheel caboose.    A little eraser work, Glosscoat (@), Rio Grande fifty foot boxcar decals, Dullcote(@) and there it is, a bumblebee foobie caboose to go with the foobie engine.  I did subsequently take the striping off the lantern.  It looked allright from an eyeball view, but from the camera, it did not look that good.

GF's Atlas Rio Grande mogul and passenger cars are also on nineteenth century pike under construction.

Bob Bufkin

  • Crew
  • *
  • Posts: 6397
  • Gender: Male
  • Respect: +44
Re: Weekend Update - 11-22-2009
« Reply #27 on: November 23, 2009, 06:03:24 AM »
0
Just getting over a cold (that's what I get for railfanning in the rain), so didn't do too much.  Mostly switching trucks and couplers on some older equipment.  Did purchase a few items such as a 1941 Chevy COE stakebed truck to work on.  Got 2 RSD's back from Lee and they run great.  Sent Lee 4 gons for the work he did.  He should have those today.

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7027
Re: Weekend Update - 11-22-2009
« Reply #28 on: November 23, 2009, 06:51:24 AM »
0
Open house at the S&U.
 

 

 


More here. http://picasaweb.google.com/dks2855/Miscellany#

For my own layout, in preparation, I'd planted about 40-some trees, finished off about six square inches of scenery, and added to the animal population.
 
« Last Edit: November 24, 2009, 07:46:11 PM by David K. Smith »

Philip H

  • Crew
  • *
  • Posts: 9026
  • Gender: Male
  • Respect: +1795
    • Layout Progress Blog
Re: Weekend Update - 11-22-2009
« Reply #29 on: November 23, 2009, 07:18:23 AM »
0
Sirenwerks and I rode over the Todd Treaster's NYS&A for his openhouse. 


For Ed:


We didn't get as close to the GGI as the CRHS guys did,


But we did find this, which should make Tom Mann jealous . . .


Full photo collection - including two raw videos is here: http://www.flickr.com/photos/41143146@N02/sets/72157622735747477/
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.