Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
Home
Help
Login
Register
TheRailwire
»
General Discussion
»
Layout Engineering Reports
»
The LIRR Industrial Service, Inc. shelf layout
« previous
next »
Print
Pages:
1
...
35
36
[
37
]
Go Down
Author
Topic: The LIRR Industrial Service, Inc. shelf layout (Read 109389 times)
0 Members and 1 Guest are viewing this topic.
dougnelson
Crew
Posts: 1335
Gender:
Respect:
+2407
Re: The LIRR Industrial Service, Inc. shelf layout
«
Reply #540 on:
September 27, 2025, 12:36:56 AM »
0
Nice job John? Next project? Car float?
Logged
See my YouTube channel:
https://www.youtube.com/c/DouglasNelson
http://prr-n-scale.blogspot.com/
John
Administrator
Crew
Posts: 13994
Respect:
+4177
Re: The LIRR Industrial Service, Inc. shelf layout
«
Reply #541 on:
September 27, 2025, 07:39:48 AM »
+3
Love it. Awesome model.
@pnolan48
Pete Nolan (rip) would approve.
Logged
Lemosteam
Crew
Posts: 6388
Gender:
PRR, The Standard Railroad of my World
Respect:
+4785
Re: The LIRR Industrial Service, Inc. shelf layout
«
Reply #542 on:
September 27, 2025, 08:35:40 AM »
0
@dougnelson
No room for car floats on the layout, the LIRR IS calls the LiRR to move/deliver their full and empty barges. Mafia Money.
@John
Thanks, I miss seeing Pete’s boats sometimes. He was a very nice man, and that is a high compliment form you, a former Sailor. Thanks for the image above and the inspiration regarding something I know little about.
Logged
John "Lemosteam" LeMerise
Lemosteam
Crew
Posts: 6388
Gender:
PRR, The Standard Railroad of my World
Respect:
+4785
Re: The LIRR Industrial Service, Inc. shelf layout
«
Reply #543 on:
November 15, 2025, 07:31:51 PM »
+6
Might be hard to see, but I installed the power poles into the scrap yard and strung the fine ezline. Also finished a couple more dragline buckets, one that is ready for transport after the scrapyard was done using it, seen here wiring the the trust 44 tonner to arrive before driving onto the flatcar., and a second for the aggregate yard scooping up some sand.
«
Last Edit: January 09, 2026, 08:45:42 AM by Lemosteam
»
Logged
John "Lemosteam" LeMerise
Print
Pages:
1
...
35
36
[
37
]
Go Up
« previous
next »
TheRailwire
»
General Discussion
»
Layout Engineering Reports
»
The LIRR Industrial Service, Inc. shelf layout