0 Members and 1 Guest are viewing this topic.
I appreciate using ME track, but still interested in learning to hand lay curves. Any YouTube resources out there that I haven't been able to find?
I've concluded that Peco's "North American" line is a never ending carrot on a stick, and that with the current world business "climate" - we won't see it any time soon.
Frankly, I’d suggest using M-E for all track - curves and otherwise. Hand-lay only the turnouts & specialty track pieces (e.g. crossings.). Hand laying actual track is TEDIOUS. And it’s more expensive, since you have to buy individual ties. And it doesn’t look as good as flex, because it lacks spike and tie plate details.As far as turnouts, YES - handlay!!! Best decision I’ve made regarding track! They look and work great; I’ve made some using paper templates and track gages, along with Fast Tracks Pointform and StockAid tools, in both code 55 and code 40.If someone like ME can do it, then practically anyone can!Jim(Fast tracks has a nice set of videos on how to use their fixtures, which also give a good idea how turnouts are constructed. Another YouTube channel is Handlaid Tracks and 3D Printed Trains - guy is from Holland and has designed tools and fixtures for various handlaying projects. Hope this helps!)
...... @Sumner does this, and probably has instructions on how he did it....
...... ...OR maybe because of the lack of those details in N-scale.....Cheerio!Bob Gilmore
...Some actually argue that a complete lack of spikeheads and tie plate details is more realistic than grossly oversized representations since these detail on prototype railroads, as far as size is concerned, are relatively small enough to escape notice......
A real spikehead would be about 0.009" across and 0.003" high above the rail web. If you took my calipers, asked me to close my eyes, set them to 0.003" and then asked me to open my eyes and tell you whether you had done that or left them at zero, I'd need to hold them up to the light and then I could barely tell. Which is to say I agree with this.
Years ago I built a switching module using hand laid code 40 rail and switches. I was inspired by an article in MRR -1975(?). I used pliobond to affix the rail to the ties. You let the pliobond dry on the rail and then with a soldering iron you heat the rail onto the ties. It makes for a VERY good attachment. I stored that module in the garage one year where the temperature ranged between -20C and +30C with no effect on the track.