The plan. I plan to use or make a triple module for this build. (36.5 * 14) The sylvan lake freighter kit I have had stuffed away from some time can be configured to 29.75 L thus allowing a little of 3" of module on each end. Another reason I want to build this module is in respect to the late P. Nolan of N scale ships. I interacted with him quite a bit to acquire the 4 hulett kits, he was very helpful in the process. I feel this is a good way to respect a lost member of the modeling community. As for type of construction I am reaching out to the masses. The ore boat will need to be lower that the main body of the module. The "water" level will need to be approximately 2" lower than track level. Although attending events is not a main concern for this module I would like to have the ability to take it to an event so I need to keep this in mind. Would it make the most sense to build a standard dimension triple module at 14" in depth and come up with some sort of add on for the boat to attach to the front?
I plan to mount the "water" along with the ship to a framed board notched to accept the module side to hold it in place.
Planning a similar approach for my break bulk carrier and container ship modules.
Where you gonna get the Huletts? And shouldn't this be in the Layout Engineering Reports forum?
And don't be afraid to put the unloading scene to the BACK of the module instead of detaching off the front. I've seen an excellent container terminal module at Altoona show that has done that port idea very, very well. Go to 7:25 on this video: />
Cleveland, Buffalo, etc. was not the only port that had them. Erie had Huletts on a much smaller scale (two of them), and PRR held the exclusive rights to the waterfront, which is why it never developed into a true open access port, either. Other than the single one in Sandy Hook NJ for trash, that may be the smallest Hulett site.I think all of them were out on a pier situation where the railroad turned 90-degrees off a shore and went out to the lake. Makes T-trak a compromise unless you are willing to get really creative and 'divert' off the main and do a perpendicular dock attachment.I've done that approach with the West Hickory module in Ttrak as the Allegheny river bridge is a 90-degree angle to the PRR main crossing to a diamond and then curving back in to meet the main. I don't get to do that setup at shows, but you might want to think about that depending on your concept.And don't be afraid to put the unloading scene to the BACK of the module instead of detaching off the front. I've seen an excellent container terminal module at Altoona show that has done that port idea very, very well. Go to 7:25 on this video: />
You can see the old outline on Google Maps Satellite view here: https://maps.app.goo.gl/5d2CYg665EWErGLp9