0 Members and 1 Guest are viewing this topic.
Don't know how much it matters for roadbed track. But when I did a layout on 2" foam I leveled it all out first. After I had my track outline I would take a 24" straight edge along the center line. You see hills and dips. I sanded down the hills and filled the dips. Then did cork and code 55.
If you are actually planning on using Kato switches, particularly the 4's, you want to look at the 'fix' for the inset of the points in the stock rail before anything goes permanent. It's not that hard and if fixes a rather miserable design flaw, a movement into the diverging side is very derailment prone.
This is coming along really well. I like how you condensed the prototype trackage yet kept the overall look and operation of the real thing. I'll be watching to see if you try to duplicate the prototype buildings.
You are really charging ahead on this, congrats! There was a long gap there after you put up the plan variations and asked for input. Kinda interesting that it's happening in the summer, when usually model RR activity levels bottom out. All other TRW postings have been very sparse, for instance. Keep on going!!Probably not on your radar now, but do you have ideas on how to expand the layout to replicate even more of the AD&N?