0 Members and 1 Guest are viewing this topic.
I would say ballast with the poles in place (apply wet glue to the ballast, especially around the poles), and after about 20 or 30 minutes, just pull the poles out. The glue should set up enough to keep the ballast in place, but won't be dry enough to glue the poles in. Any ballast that comes loose in the process you should be able to gently put back in place.-Brian.
Yeah, that's basically what I was describing too. But in my version, you'd have some ballast attached to the pole so that when it's in place the visual separation line will be masked by the ballast itself.
Looking at John's earlier photo, those poles do have concrete "footings" or bases. It would have been good if those bases coudl have been planted in the layout (with ballast around them), and the poles installed and removed from the bases.