0 Members and 1 Guest are viewing this topic.
I made some good progress on the foundations for the Arbutus canyon bridge. Craig
I installed the last of the foam for the river, finished wiring the last servos, and painted the track and backdrop. This is the Windy Point scene, which should be pretty neat when it is done.
Few more minutes of work today. Added some wire to activate the brake shoes and a thicker wire for a drive shaft. Weathered the frame so I could pop in the wheels in for the last time Put a tiny smear of silver bearing grease (conducts electricity) on the pickups. Guess I still need a tail pipe and muffler.
00-90 size drill bits and taps are rather fragile. I'm curious why not just use 0-80 screws to begin with? With larger drill bit and tap I think there would be less chances of breakage during drilling/tapping.
Craig
@peteski likes the money shots...
Hey look, it runs!
Hey look, it runs! />