0 Members and 1 Guest are viewing this topic.
. . . I found that I was able to drill and tap a hole to take a 00-90 machine screw. A 0-80 washer above and below the collar on the servo held everything in place (a 00-90 washer was too small for the mounting hole on the collar), and all six servos are now fully secured to their mounting brackets.
Ignore the crappy paint job and focus on the details lolUP TTT 2-10-2 fresh off the printer. Never in my right mind would i have thought i could be cranking these out. Drasko
Nice! I guess you will now have to come up with a new signature line for your posts.
American Steel and Wire is finally getting some tracks laid. It is the last section of the layout that needs to be completed before moving onto scenery.