Author Topic: Mishap with Strasburg 475  (Read 3423 times)

0 Members and 1 Guest are viewing this topic.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26062
  • Head Kino
  • Respect: +11543
    • Conrail 1285
Mishap with Strasburg 475
« on: November 02, 2022, 02:15:19 PM »
+1
Whoops!

https://www.facebook.com/watch/?extid=CL-UNK-UNK-UNK-AN_GK0T-GK1C&mibextid=979an5&v=496360772530823

Apparently whoever put the excavator there yesterday forgot to reline the switch for the main.

The crew was following standard railroad procedure for waving at the train.

Remember: complacency kills. Luckily this time all it killed was a replaceable part of a locomotive.

Given Strasburg's chops, I wouldn't be surprised if 475 was back in action next weekend.

Dave V

  • Crew
  • *
  • Posts: 12233
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +11670
Re: Mishap with Strasburg 475
« Reply #1 on: November 02, 2022, 03:37:39 PM »
0
Yeah, I don't know...you can see the crane puncture the smokebox. Depends on how deep in the damage goes. If the steam pipes or flue sheet were compromised, that's gonna be a much longer and more expensive repair. The sudden burst of black smoke on impact suggests the damage is more than cosmetic.

EDIT: It's all over YouTube now:

« Last Edit: November 02, 2022, 03:39:53 PM by Dave V »

sd45elect2000

  • Crew
  • *
  • Posts: 1110
  • Respect: +453
Re: Mishap with Strasburg 475
« Reply #2 on: November 02, 2022, 03:39:51 PM »
+1
Usually a switch target for a mainline track is either red for reverse and green for normal position. Any other colors don’t have to made normal after use, since this is an other than main track it would be crew failure.


wazzou

  • Crew
  • *
  • Posts: 6812
  • #GoCougs
  • Respect: +1736
Re: Mishap with Strasburg 475
« Reply #3 on: November 02, 2022, 04:35:49 PM »
0
Holy Sh!t...yeah, that's bad.
That cast iron Smokebox door punctured like cardboard.

Honestly, it's surprising to me that they were moving that fast in the area they were in to begin with.
Bryan

Member of NPRHA, Modeling Committee Member
http://www.nprha.org/
Member of MRHA


Chris333

  • Crew
  • *
  • Posts: 19574
  • Respect: +6891
Re: Mishap with Strasburg 475
« Reply #4 on: November 02, 2022, 06:34:55 PM »
+1
If it punctured the flue sheet wouldn't there be a big boom from all the steam pressure?

Hiroe

  • Crew
  • *
  • Posts: 594
  • Respect: +256
Re: Mishap with Strasburg 475
« Reply #5 on: November 02, 2022, 06:49:26 PM »
+2


wubba lubba dub dub

sd45elect2000

  • Crew
  • *
  • Posts: 1110
  • Respect: +453
Re: Mishap with Strasburg 475
« Reply #6 on: November 02, 2022, 07:00:26 PM »
0
If it punctured the flue sheet wouldn't there be a big boom from all the steam pressure?

Yes, At the very least a big steam leak. There was substantial penetration however, so I assume the petticoat got bent up. Still, I think the repair or replacement of the excavator will in the short run cost more. That said, the locomotive headlights aren't cheap.

Hedron

  • Crew
  • *
  • Posts: 137
  • Personal Text
  • Respect: +80
Re: Mishap with Strasburg 475
« Reply #7 on: November 02, 2022, 07:41:58 PM »
0
Fresh link to video, or at least it was as I post this:


Chris333

  • Crew
  • *
  • Posts: 19574
  • Respect: +6891
Re: Mishap with Strasburg 475
« Reply #8 on: November 03, 2022, 01:17:30 AM »
0
Reading the video comments are the best  :lol:

Chris333

  • Crew
  • *
  • Posts: 19574
  • Respect: +6891
Re: Mishap with Strasburg 475
« Reply #9 on: November 03, 2022, 01:36:16 AM »
+2
According to:
https://www.trains.com/trn/news-reviews/news-wire/strasburg-collision-damages-no-475-no-one-hurt/?fbclid=IwAR375tLZbZmnZmNh8zWPkCmZ7lo_u2kMDpgffaPgY9hhiOIl-5pKxb0OxWw

Quote
Damaged were the smokebox front and door, some auxiliary metal pieces, and the headlight, as well as the bucket, piston, and hydraulic hoses on the trackhoe. The trackhoe arm did not pierce or deform anything vital to steam operation, such as No. 475’s flues or front flue sheet.


wvgca

  • Crew
  • *
  • Posts: 320
  • Respect: +44
Re: Mishap with Strasburg 475
« Reply #11 on: November 03, 2022, 08:58:20 AM »
0
it doesn't take much at all to punch through old cast iron ...

Englewood

  • Crew
  • *
  • Posts: 937
  • Respect: +411
Re: Mishap with Strasburg 475
« Reply #12 on: November 03, 2022, 06:29:44 PM »
0
I guess they never heard of restricted speed....

John

  • Administrator
  • Crew
  • *****
  • Posts: 13997
  • Respect: +4178
Re: Mishap with Strasburg 475
« Reply #13 on: November 03, 2022, 06:42:44 PM »
+2
On something like that operation, they perform the exact same operation 3 times a day - leave Strasburg, run 4 miles, run around the train waving at the passengers, then couple up and head back - wash, rinse, repeat ..

It's quite easy to go into auto pilot .. and since this accident was because the norm changed, I can see it happening ..  Thats why airplanes have checklists and pilots follow them

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26062
  • Head Kino
  • Respect: +11543
    • Conrail 1285
Re: Mishap with Strasburg 475
« Reply #14 on: November 04, 2022, 10:00:29 AM »
0
On something like that operation, they perform the exact same operation 3 times a day - leave Strasburg, run 4 miles, run around the train waving at the passengers, then couple up and head back - wash, rinse, repeat ..

It's quite easy to go into auto pilot .. and since this accident was because the norm changed, I can see it happening ..  Thats why airplanes have checklists and pilots follow them

Yep. And it's clear that Strasburg isn't trying to hang its people out to dry over it.

Quote
"Strasburg Rail Road Co. statement regarding incident at Leaman Place Junction, 2 November 2022
On Wednesday, 2 November 2022 at 11:23 AM, steam locomotive #475, owned and operated by Strasburg Rail Road Co. (SRC) was involved in an incident at Leaman Place Junction where the locomotive struck a rail-mounted excavator on a stub siding track. The excavator was placed on the stub track the previous evening for storage by the Maintenance of Way (MOW) crew working in the area. Our internal investigation has concluded that after placing the excavator on the stub track for storage, the MOW crew member failed to realign the track switch and to secure it in normal position. When running the locomotive around the passenger train on the Main Track runaround where the stub track switch is located, the locomotive crew did not notice the misaligned switch and entered the stub track at approximately 10 MPH, the speed limit for that track, striking the stationary MOW equipment and coming to a stop after a short distance. Both the excavator and locomotive incurred moderate damage.
On any given day we have as many as 75 employees working in our operation and several thousand guests ride our trains. We take seriously the safety of everyone who interacts with us in any capacity, every single day. Our decades long history indicates that despite the unique and complex nature of our operation, we have an outstanding safety record when taken in context of the number of employee hours worked, trains operated, and passengers and freight hauled each year. We also take seriously the rules and regulations that apply to our operations. We are cooperating with FRA as they investigate and will comply with their requirements and recommendations. Additionally, we are using this opportunity to perform root cause analysis and identify training gaps, operational monitoring practices, or other factors that may have contributed to this accident.
SRC is proud to have an excellent, dedicated, professional staff who care deeply for the people who work on and ride our trains every day. We acknowledge our mistakes when they are made and learn from them any time they happen. Our front-line staff enjoys the full support and backing of our management team, and we work hand-in-hand to achieve our goals. We do not excuse mistakes, but we acknowledge the humanity of those who make them, as we all do. We live in a world where people are judged too quickly and dismissed by many employers over minor mistakes. We intend to lead by example, helping the valuable, committed members of our team who were involved in this incident learn and grow from their actions. We ask for your consideration before joining the lynch-mob mentality of ignorant or irrational criticism. Instead, we welcome continued support from our community, railroad and otherwise.
Sincerely,
Brendan E. Zeigler
VP – Chief Mechanical Officer
Strasburg Rail Road Co."