0 Members and 1 Guest are viewing this topic.
I was off today, so I built the parking lot/loading area for a transloading facility. Although the loading area surface is still slightly damp, I couldn’t resist setting up the truck, trailers, and rail car.More on The Carolina Sandhills Lines thread in the Layout Engineering Forum.DFF
I finished a pair of CGW transfer cabooses this week.178 was an undecorated Bluford model and 176 is a Fox Valley repaint.
Aaron,aren't the hoods too wide on most N scale locos from Kato and Atlas (due to the width of the motor)? If that is true, and you are able to live with that, the 0.5mm height difference seems insignificant. I suspect that many commercially made models have dimensions which are off, and modelers generally live with those inaccuracies.Yes, I understand that you painstakingly designed that hood, and are proud that you did an accurate job, but sometimes we have to compromise slightly. Personally I'm amazed how well your hood looks and how detailed it is. Rest assured that it will likely never be made by any of the "big" companies. Since you are using an existing chassis, why not enjoy the fruits of your labor, even when a small compromise had to be made.I had another thought: can you just reduce the height of the locos chassis (like we often do to make room for a decoders)? Or (if I understand correctly what's bothering you), just extend down the size of that side grill by 0.5mm. Might be less noticeable that way. Again, we often have to "fudge" things when making models.
Welcome back Caleb, and good work everyone!Another week of decent progress on my layout, principally the wiring for the Fort John Subdivision extension. Here is the shelf after installation of the DCC command bus, auxiliary bus and track bus wires:And here are the connections between the Highway 97 section and the FSJ Sub extension:Looking along the extension shelf with all wiring now installed:......Tim
With Bob back, I thought I would finish off one of his auto carriers.I still need to add a touch of weathering to the grill, touch up the tires and add headlights. But it's about 95% done. Two down, 8 more to go.
Another week of decent progress on my layout, principally the wiring for the Fort John Subdivision extension.
Tim, really like the use of the biscuit as an alignment tool. What is with the 2 notches in the shelf?
Nice Daniel. I just found a stash of 20 carriers and 30 auto ramps last night I did not know I had.