0 Members and 1 Guest are viewing this topic.
I used thin quarter-inch plywood, on risers on a 1x2 grid system.
substitute scrap lumber for reinforcement (particularly free lumber) and use paper full-size templates for design using real track components instead of computer planning templates that can't be trimmed and tweaked. I'm just not a big fan of Complexity Bias here.
I made my helix from CNC milled MDF quarter sections. What really helped speed up construction and made the cost if the cutting worth it was having a 1 mm deep channel milled along the curved centerline to the exact width of Atlas Code 55 flex. Once I had all the pieces ready, curves, spacer blocks & all rail joiners prewired with feeders I was able to build up the whole thing over the weekend with screws and construction adhesive to bond the track into the groove No waiting for anything to dry to keep centerline.
Ed, How much surface are you thinking you need? 1/2" 5-ply, sanded, hardwood (maple or birch) plywood is about $55 for a 4'x8' sheet (I took a gander at Lowe's and a few other places online). That stuff, as you probably know, is super strong, flat, and stable. I know it's not "cheap", but if you only need 1 or 2 sheets, $50 - $100 for something that will be supporting an entire section of your layout doesn't seem like a bad investment.
^^^^^^^^What I’m thinking too. Plus if you get a Lowe’s credit card in store you get 20% off the first purchase and 5% off after that.Then your 100 bucks works out to 80.https://www.lowes.com/l/Credit/new-account-promo-tandc.html
I think I'm going to measure the cargo space in the Shark and have them cut the sheets down to that size for ultimate portability. It can carry a surprisingly large load, but 4x8 sheets aren't gonna fit.