I made my helix from CNC milled MDF quarter sections. What really helped speed up construction and made the cost if the cutting worth it was having a 1 mm deep channel milled along the curved centerline to the exact width of Atlas Code 55 flex. Once I had all the pieces ready, curves, spacer blocks & all rail joiners prewired with feeders I was able to build up the whole thing over the weekend with screws and construction adhesive to bond the track into the groove No waiting for anything to dry to keep centreline.At the same time I had the same vendor cut a few sheets of MDF into perfect splines for subroadbed.
Most of us barely think twice about dropping a couple hundred on a new loco, so I figure spending a few more dollars than we prefer on good solid plywood is a good investment...
It’s not the load carrying ability of 1/4” plywood that is my concern. I’ve used even smaller door-skin plywood to form the bridge deck over a stream on an n-scale layout. Glue a couple of plate girder sides on & voila... instant bridge. It’s that a lot of 1/4” plywood doesn’t have a very stable laminate if you buy the cheaper interior grade plywood which doesn’t use a waterproof glue. Plywood made with 5 ply laminate with waterproof glue is available in 1/4” and is amazing stiff & stable. 3 ply can be twisted like a pretzel.
Are you within a 75-minute round-trip from a Home Depot?If so, then rent one of their trucks for $19.
OK, so this may have been covered earlier, but you can reduce waste by going with thinner ply and layering it for the curved sections of roadbed. Cut a series of arcs for the most common radii, and overlap them like very long, skinny bricks. You should be able to get a lot of such arc segments out of a sheet of ply with little waste, then glue and laminate them together in overlapping sections to make full arcs for long curves.Does this make any sense to anyone, or do I need to get my crayons out?
Yes, it is too thin, but on a multi-level layout where you're minimizing grades, that buys you a tad of clearance, including for hands between levels.If you look at the post - I turned a stiffener on edge between risers wherever I could. Just scrap lumber, but it sure helps to have an overhead radial saw (which I do) to rip up almost anything to a consistent dimension shape.The other advantage to 1/4" is that it makes it a heck of a lot easier for under-table switch mounts, makes it lighter, and does some of the vertical curve easements rather naturally.
I think in N scale we tend to overdo the benchwork .. some of you would freak out at my wiring and carpentry .. I'm not building a house -- I want the structure to hold little trains ..
However, sometimes you'll have 1:1 people leaning on your 1:160 layout.The April issue of RMC has a brief article which includes a photo of Rapido's Jason Shron leaning (if not almost laying) on the lower level of his layout while working on some wiring on the underside of the layout's upper level.Ed K is planning to have a two-level layout.