0 Members and 1 Guest are viewing this topic.
Could it be done this way?https://drive.google.com/open?id=0BwBRBKEI1xrxRkl0czdWTGdmVHM
The inner signals are not needed, especially if this is a single interlocking on the prototype.-Dave
In this case, if you need a special aspect for a double-diverging route, how about this:
... if any route lined exits the interlocking onto an unsignalled non-main track, you'd get a Restricting indication.
That's nice to know.So is the red-over-yellow-over-yellow the correct aspect for a diverging route followed by another diverging route, even if there's no signal at the second one? Or should it simply be red-over-red-over-green?
When in doubt, find a rule book for your railroad. Here is a handy set of SP aspects:http://lundsten.dk/us_signaling/aspects_sp1996/index.html
I think the only possible red-red-green indication would be if the station track had full signal detection AND the w/b exit was signaled AND its indication at the time was top yellow or green. IOW, red-red-green really would only be for a second diverging route with expected continuous travel into a signaled and clear block.
Why?Granted I'm not up on SP's specific rules, but anything I've ever seen it doesn't matter how many switches you're diverging through (whether one or ten), just that you're diverging. An interlocking with this schematic or similar would be pretty common.If your railroad uses speed signaling like we do up in here in Canada (I believe most western US roads just used simple diverging route indications), the indication is based on the most restrictive speed rating in the particular route. (i.e. any number of "Medium" speed turnouts and at least one "Slow" speed turnout -> "Slow Clear" signal indication)
Based on Northwest practices (not necessarily the same as SP) I would say R-R-G, Diverging Clear. Red over Yellow is Diverging Approach, used where the next signal is Red (Stop). From your description, there is no "next signal", so Approach wouldn't be needed.
I couldn't find any aspect that had red over two non-reds, although that doesn't mean it doesn't exist. ...
Well there's a next signal within the interlocking in the first option I posted a link for, and not in the second. So that makes a difference.
Chris: Thank you. The only interlocking I'm intimately familiar with is (was) the Pasco NP/SP&S junction, and it had signals for nearly every turnout, besides not being that complicated. I just assumed the usual way of doing it was to have a signal for each possible route. Your experience trumps my untrained observations!
... you can probably do everything with two-head signals.
Yeah, but that's no fun. There's so much joy to be had in stuffing wiring for three heads down microscopic brass tubing.
Guys thanks for all the responses. I'm going to respond to them backwards because it makes more sense somehow. My first response to railnerd is really the question I'm asking, which you guys have helped to clarify.Yup, I've been aware of that page for a long time, even have it downloaded to my harddrive. But it doesn't answer this question for me:Is red-red-green equally appropriate for (a) and (b)?a) First diverging turnout is closed, and then a bit down the same track a second diverging route is thrown.vs.b) Diverging route is thrown, bringing you onto a different track, where a second diverging route is also thrown. (This is the situation in our trackplan.)