0 Members and 1 Guest are viewing this topic.
Finished up my latest project: SP DF-200 GE 70 tonner #5101Thanks,Wolf
Got to make the control box from some old raised panels from my last kitchen. Scraps made the box. This is the same cherry I used to make the cabinets supporting the layout.Door closed:Door open. The back side of the door supports a programming track. The UP5 panel is on the far side of the box where the throttle is seen.I can't wait to start messing with CV settings... I think!
Well not as good as some work being done here but this kit looks simple but is a real bugger to build. The tower stacks rings and the rings are all larger on the bottom (for mold releasing I assume) , so hard to get it sanded smooth when glued up. Then comes the tedious sprue cutting of all of the conveyor. It is hard to get straight and I used very thin evergreen rod at the joints of the canopy. Not sure how to get coal all the way down the belt line inside but have a couple ideas , then weather the outside and need to brace the uprights somehow.Thanks for taking a look, Mike
That is some nice work Mike. It would look great on the new layout I am planning. Do you want to make a second and send it over?
Doing some test fitting of my C39-8 shell. It needs some tweaking but it's almost good to go.
That is pretty darn cool John, I like it a lot.Mike
Isn't the C40 chassis a little long? I thought the C39s were a few feet shorter.