
believe the 3 Pane window was to Assist Switching moves.
maybe the RS-3s that didn't have it were Passenger service engines ?
N&W RS-11s had 3 pane windows also,but N&W had Alco put almost
every Freight Service Option in most of their RS-11 fleet.
recall that these locos were called "Road Switchers"
some Baldwin units had it, and the NYC Lima Road Switcher Fleet had
them also.
2 Extra Fixed cab Side windows seemed to Originate at GE, but some EMDs
had them also.
Spikre