0 Members and 1 Guest are viewing this topic.
I'm thinking this started in some areas in the late 60s and expanded significantly through the 1970s but will need to dig around a little to be sure.
It really started with unit trains, as there's little point in flood loading unless you have a lot of (nearly) identical cars to load at one time. For 1971, unless you're modeling a very large mine, or consumer, you probably wouldn't see them.It makes a very heavy car, but I made loads for my TW hoppers from real coal, using the TW loads. Turn the load over and it's hollow. Sand the sides down so that it slides in and out easily, then pile your choice of coal in the load, and glue it like ballast. IN my case, I used some black craft paint as an undercoat, for something that will stick to the plastic a little better, smearing it on thick. While it was wet, I poured the coal in, pressing the first layer into the paint, then building the heap. Set it aside for a few minutes to give the paint time to start to dry. Then use your favorite "wet water" and glue to set everything, just like ballasting track. IT will take longer to dry than ballast, because you have a think pile, and all of the water has to evaporate through the top, but once it's hard you have a unique load, at very low cost.Arizona Rock and Mineral has several grades of coal, from dust to lumps, other companies also sell it, or you can use N and HO ballast, painting it black after it dries. Whatever you use, it's cheaper than buying new loads, and you can match the loads to spilled coal around your layout, if it's not just passing through.
Ah, if only I knew where to dig....