0 Members and 1 Guest are viewing this topic.
Scott, the iron ore mine in Marmora was rail served by CN, but the IKO operation in Madoc does not seem to have been served by rail at any point.The Havelock Sub has seen a lot of work over the past few years, Pud. But it's still slow going. They've installed 80' sections of rail in curves, replacing the 39' sections, to lessen the rock'n'rolling through them. I often joke that a Havelock crew is more likely to get seasick then that of a lake freighter. Of note, the 80' rail is salvaged from the hump bowl at Agincourt, withing is largely, if not completely, gone now.To truly improve the line, they'd need to raise the ties 12" to 18" out of the sand, and that isn't likely to happen on CP's dime.
A guy can dream right??????