Author Topic: Conrail Windsor St Yard (York PA) Engineering Report  (Read 279801 times)

0 Members and 1 Guest are viewing this topic.

Chris333

  • Crew
  • *
  • Posts: 19547
  • Respect: +6845
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #660 on: March 04, 2016, 04:27:22 PM »
+1
Just under my simple door layout I used up 6 50' rolls of #20 Atlas hook up wire.  :scared:  Took me like a week rolling around under the layout with soldering iron.

davefoxx

  • Crew
  • *
  • Posts: 12334
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8559
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #661 on: March 04, 2016, 05:00:17 PM »
0
Just under my simple door layout I used up 6 50' rolls of #20 Atlas hook up wire.  :scared:  Took me like a week rolling around under the layout with soldering iron.

Wow!  Good thing you didn't convert to DCC and its electrical complexity.  :trollface:

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26042
  • Head Kino
  • Respect: +11497
    • Conrail 1285

mu26aeh

  • Crew
  • *
  • Posts: 5861
  • Gender: Male
  • Respect: +4843
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #663 on: March 04, 2016, 08:32:38 PM »
0
Thank goodness for http://m.lowes.com/pd/100-ft-20-AWG-2-Conductor-Twisted-Doorbell-Wire/3369292

I thought that's what that was.  I bought a roll myself, am using it for feeders.

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2098
  • Respect: +219
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #664 on: March 04, 2016, 11:44:22 PM »
+1
Dude
Go up the street to Bainesville
Buy the terminal strip jumpers for $2


Stop making those annoying ghetto jumpers

Lol
"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26042
  • Head Kino
  • Respect: +11497
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #665 on: March 11, 2016, 09:43:46 AM »
+5
So, this happened last night...
/>
I finished getting everything wired up.

The track isn't glued down yet, because I still have some work to do on switches, so ignore the various bends that look a bit off.

The exciting thing is that, this end is now operational!

I guess it's time to get going on the other end.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26042
  • Head Kino
  • Respect: +11497
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #666 on: March 23, 2016, 12:37:36 PM »
+3
Now that I have stuff running around the one side, it's time to get the other going.

I completed the most complicated piece of benchwork I had to build.





Note how low it is compared to the layout next to it. That's because it's going to become Black Bridge: http://binged.it/1Rzld1p
http://www.ydr.com/story/news/history/blogs/yorkspast/2015/05/29/black-bridge/74059670/

I'll be building the terrain up with more foam.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26042
  • Head Kino
  • Respect: +11497
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #667 on: March 23, 2016, 06:53:41 PM »
+2
Even more progress.




And the entire basement.


davefoxx

  • Crew
  • *
  • Posts: 12334
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8559
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #668 on: March 23, 2016, 07:10:56 PM »
0
Awesome, Ed.  Let me know if you want any help laying cork roadbed or track.  I work for cheap.

DFF

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

wm3798

  • Crew
  • *
  • Posts: 16551
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7433
    • Western Maryland Railway Western Lines
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #669 on: March 23, 2016, 09:15:56 PM »
+1
Starting to look like an actual layout!  Just make sure Foxx isn't wearing a tie when he comes to work on the track...  The hourly rate is a lot higher.

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

davefoxx

  • Crew
  • *
  • Posts: 12334
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8559
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #670 on: March 23, 2016, 10:27:36 PM »
+1
Starting to look like an actual layout!  Just make sure Foxx isn't wearing a tie when he comes to work on the track...  The hourly rate is a lot higher.

Lee

What can I say?  I like to look good while I operate model trains.  Suit up!



:D :D :D

DFF

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 26042
  • Head Kino
  • Respect: +11497
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #671 on: March 23, 2016, 10:29:55 PM »
+2
Ha! I was even wearing a shirt with a collar in that photo.

Now that I work from home, I don't do that anymore... lol.

But I'll make sure I'll put pants on prior to visitors arriving.

eric220

  • The Pitt
  • Crew
  • *
  • Posts: 3738
  • Gender: Male
  • Continuing my abomination unto history
  • Respect: +648
    • The Modern PRR
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #672 on: March 24, 2016, 01:11:13 AM »
0
User ignored.

Hey now, I claim rights to that photo! Infringement penalties might be payable in layout visits around early May.

 :D
-Eric

Modeling a transcontinental PRR
http://www.pennsylvania-railroad.com

davefoxx

  • Crew
  • *
  • Posts: 12334
  • Gender: Male
  • TRW Plaid Member
  • Respect: +8559
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #673 on: March 24, 2016, 02:15:59 AM »
0
Hey now, I claim rights to that photo! Infringement penalties might be payable in layout visits around early May.

 :D

Heh, too bad you won't be able to read this due to the "ignore" button ;), but you're certainly welcome to stop by and visit.  In fact, I was surprised to see that picture was almost two-and-a-half years old.  How time flies!

DFF

A Proud HOer
BUY ALL THE TRAINS!
Still General Counsel to the Laurel Valley Ry.

basementcalling

  • Crew
  • *
  • Posts: 3922
  • Gender: Male
  • Respect: +1056
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #674 on: March 24, 2016, 06:27:48 AM »
0
Damn, Ed has one hell of a dress code for visitors.  :D
Peter Pfotenhauer