0 Members and 1 Guest are viewing this topic.
If I did the X23 then someone on this forum would have to be in-charge of keeping Bryan locked up when I did a foobie.
Don't continue to reinforce the perception that Bryan and others don't acknowledge the need for foobies. The problem is doing only foobies, or foobies first, before prototype schemes. This is an important distinction.
Regarding the X23 — ESM would look at the X23 before MTL would ... but personally ESM would tool the R7 reefer before tooling another esoteric boxcar, since 1) I don't have a reefer model, and 2) I can do ten proto schemes on the R7 that represent half the country as opposed to one scheme of one road on the X23, and there's no other prototype that's even close to the X23. But you always could kitbash an R7 into an X23.
Two of the three ESM ready-to-run injection-molded models are Pennsy prototypes. It may be a while before a third appears.
Joe,How about these?
I can wait. I'm not familiar with your other models, but if some 40s and early 50s stuff comes rolling out of your doors, my wallet will go rolling in.