0 Members and 1 Guest are viewing this topic.
Spent most of my time working on the interior of my Lincoln Warehouse, on the beginning or the end of the Beer Line (depending on your perspective). The warehouse is modeled as a flat against the backdrop, and the interior loading dock was built on a removable shelf to maintain access to my circuit breaker panel. Here is the view of the warehouse flat without the loading tracks.The interior loading tracks. This is a simple box built out of masonite, covered with brick sheet, and mounted on 3/4 inch plywood. Only one side of the box is shown below.The finished track installed in the track opening. I will add some lighting to help see inside the loading bay.Best wishes, Dave
Hornwrecker,John and I were in you zip code yesterday! We almost decided to crash your Saturday afternoon!
You should have. I was just here by myself, goofing around with my new NCE DCC. Even had an overabundance of beer, since my usual workcrew didn't show. That NW2 is an amazing engine: not much pulling power, but will creep along with the best of them, although a tad more gear noise than expected.
This update is for all that have scratchbuilt any structure with truss framing. Have scratchbuilt a half dozen roundhouses, plenty of finicky trimming and fitting, but for me the part of the project that requires the most effort is joining that first pair of trusses. If they are off the rest of the structure doesn't have a chance. After that first pair, one has a fairly stable platform to add the rest. Fairly sure this will be the last RH for me, at 64, the stiffness in the neck really limits time spent in a workbench setting.
Vincent,Sound like you got the package with the step risers. Now we need to see those in action! I am curious whether the top step bracket will be usable, as it is such a small piece. As for the warehouse, it was constructed from plans retrieved from the city engineers office by a Beer Line friend, Richard Robinson. It is true to scale, in height (72 ft), but I had to get rid of one vertical brick curtain section (to the left of where the RR tracks enter). There are still some details I need to add.