0 Members and 1 Guest are viewing this topic.
5. Now it gets serious. The PRR T-1, the SP&S 4-8-4, PRR I-1. Those things are nasty. Long rigid wheelbases, withdrivers that basically say, "Either you keep those rails in gauge everywhere, and make every point and frog proper and smooth,or I will climb right up and out of those rails."
THIS. I've found that once a piece of track has been adjusted for the long rigid wheelbase locomotives, pretty much everything else will run flawlessly.