Author Topic: Yard Work and Expansion begins on WM  (Read 1333 times)

0 Members and 1 Guest are viewing this topic.

wm3798

  • Crew
  • *
  • Posts: 16557
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7439
    • Western Maryland Railway Western Lines
Yard Work and Expansion begins on WM
« on: November 05, 2009, 11:53:22 AM »
0
This is a re-run for some of you... but I wanted to open it up for broader comment...

Work gets underway.  Tonight the ICC approved the abandonment of the Utility Sub of the Western Maryland from a point just west of North Junction to the Potomac River.  The Yard facilities at Ridgeley have been carefully removed, and stored for re-construction.

I think I've decided to strip the yard, and rebuild it on the 30" door panel I have out in the garage.  That will give me the yard platforms to press into some other yet to be determined service.  I will outfit the other L-girder frame I have in the garage with the Connellsville staging loop, then place the new Ridgely yard on the door about 6-8" above it.

The biggest challenge immediately facing me is the unbelievable pile of crap that I have in that room.  One of the huge benefits of expanding the layout will be a much improved storage schematic under the benchwork.  It turns out I'm going to be off Monday due to a weekend seminar I'm running, then again on Wednesday for Veterans Day.  I'm thinking I can get a lot of crap moved and framing built.

I have to get up and down with my neighbor, who's in the middle of remodeling his kitchen.  He's had two very attractive cuts of 1/2" plywood on his porch for a couple of weeks, and I'm thinking they might be large scraps I can "obtain" for the staging yard base.

More news as it happens...

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

wm3798

  • Crew
  • *
  • Posts: 16557
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7439
    • Western Maryland Railway Western Lines
Re: Yard Work and Expansion begins on WM
« Reply #1 on: November 05, 2009, 11:54:06 AM »
0
Worked out some of the critical engineering for the new section. 


Looks like everything will work, at least on paper!

Hey John, do you still have that bundle of salvage code 80?  I've got to build me a staging yard...

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

Mark5

  • Crew
  • *
  • Posts: 11861
  • Always with the negative waves Moriarty ...
  • Respect: +932
Re: Yard Work and Expansion begins on WM
« Reply #2 on: November 05, 2009, 12:00:13 PM »
0
Looks like everything will work, at least on paper!

It always works on paper - dammit I should'a built my layout on paper instead of wood!


wm3798

  • Crew
  • *
  • Posts: 16557
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +7439
    • Western Maryland Railway Western Lines
Re: Yard Work and Expansion begins on WM
« Reply #3 on: November 05, 2009, 01:57:06 PM »
0
Another view.


This is a slice through the engine terminal to show how the benchwork will be framed.

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net