0 Members and 1 Guest are viewing this topic.
Oh, man... Operating PRR PL dwarfs AND catenary... Please, no more! You'll drive me back to HO!
I really like the clean benchwork. It's nice to see a layout where the equipment and locomotives are weathered realistically compared to a lot of magazine layouts where brown chalks seem to be thrown on every surface they can find. The scenery looks terrific, and working cat to boot! ;D
BICK Tower:
Yeah, O scale, you can tell because the rails look too far apart, 5' gauge instead of 4'8-1/2"...Other than that Mrs. Lincoln, how was the play? (friendly ribbing of course, looks like a great layout.)
The wires are coming.Spent about 12 hours sat and 8 hours sun working on four of these two-track span support towers:Took me about an hour to figure out what i was doing, then the first two (towards the tunnel) took about 3 hours each. Today, i managed to shave that time down to about an hour and 15 each, and built the two closer towers, which are pictured above on my "jig". The "footings" are actually sections of 1/2" hardwood dowel, cut about 3" long and hammered into 1/2" holes drilled in the subroadbed, then drilled with a #8 bit to act as sockets for the poles. (I would have preferred using square footings, but square holes are a lot harder to drill.) More photographs of the first two, plus assembly of the 4th, are available here.I was supposed to be reusing a lot of the cat off the old layout, but it's vastly complicated by the fact that they painted everything (poles, wires, and insulators), and used steel music wire; so now it's covered in grunky paint and loaded with rust. Anything i do want to reuse has to be thoroughly cleaned before it can even be disassembled; as even with my 400-watt grandpa iron i can't get good heat transfer to painted/rusty metal. If i'm going to try to salvage any of it, i might just coil it all at the bottom of a new 40-gallon rubbermaid trash can, and soak it in vinegar for a week or two to clean the rust off. (Will vinegar also remove the old paint?)I'll probably build a few more span towers for around the curve (behind the camera) before hanging the actual running wire. Yes, the equipment *will* run off the pans.--Drew
Five and Six.Seven.Also, if anyone wants to prep their electric locomotives to run under the wire when visiting the CV, here's the electrical schematic for how i've got the pantographs and toggle switch connected: All the diodes are 1n4148 high-speed switching diodes. The relays are simple 12vdc SPST, although i typically use the Potter-Brumfield KH styles. This setup is designed to allow the locomotive to choose the proper return rail, regardless of which way it's oriented when placed on the track.--Drew