0 Members and 1 Guest are viewing this topic.
the layout plans are still ok - the house sucked.-steve
So when are you going to be done the layout
Quote from: sizemore on July 10, 2009, 08:19:05 AMSo when are you going to be done the layout when you coming over to help build benchwork?
What kind of beer's in the fridge? We like Brian better, but he still needs to hang sheetrock...
If you have shop space available, we'll just need to schedule a day and time... Hint: The wife and kids are going to the beach end of July...
Am I correct in assuming that the staging level will form a lower loop around the whole room?
Mr. Brian has one. He could also stand to have a benchwork internship now that he has the beginnings of a layout. And poosh come to shove, I have a minky van that can run seatless. Next step will be to apply the room dimensions to the track plan so we can build a material list and basic module design. Am I correct in assuming that the staging level will form a lower loop around the whole room?Lee
What about the staging deck?