0 Members and 1 Guest are viewing this topic.
I usually take ties from old Atlas flextrack/sectional pieces that I have laying around. I cut them off the tie strip the length I need them - mostly its a pair but sometimes three and sometimes just one. I still shave the spike heads off and sand them down a bit so they slip under the joiners easily. This is easier than dealing with the Peco ties.
Yep. In addition to slicing off the spike heads, I've also found that a pass or two over a sanding stick (on the bottom side) makes them slide under much easier.
Laying ties at rail joints after the track is down is a common approach to laying track. However, just because it's common doesn't mean it's the best way. With a little planning I believe there's a better way which yields more realistic results:Here's what I do: (1) Cut three or four (or more) spacing pieces between ties away on the ends of each piece of track, and then move the ties away from the rail ends (2) Snip railjoiners so they're only as long as the space between ties, and neatly solder them to the rail ends, eyeballing the track to ensure the transition is smooth between pieces of rail (3) move the ties back into place, butting two ties up against either side of the short railjoiners. Voila! You have barely visible rail joints, mechanical control of the rail ends, electrical continuity (although I strongly encourage everybody to put a feeder on EVERY PIECE OF RAIL). Photo (1)- Here's an example of the rail ends with ties spacers cut and ties moved back away from the ends:Photo (2) - Joiners soldered but track not painted yet:Photo (3) - Track painted, but not weathered or ballasted...joiners virtually disappear & no missing spikeheads or funky ties:Yes, this does take a little longer, but I think it's worth it...Cheerio!Bob Gilmore
Very nice. Any tips on cutting short pieces of rail joiner and no just crushing them in to flat folded metal?Craig.