The big highlight of 2010 was, without a doubt, seeing Version Two of my railroad come to life for its first official operating session.
Layout construction began in November 2008 and a trial shake-down session took place in December 2009. Then came the NC Rail Run (N Scale Edition) in February 2010, during which several visiting operators came to put the CR&E to the test. At the end of the day, I was very happy that the railroad performed rather well.
In April 2010, my regular crew was back to operating the CR&E after a two year layoff while I moved and rebuilt. Bugs that were found during the RailRun had been fixed and the railroad ran extremely well.
Seeing the railroad come to life has always put a smile on my face.