I think you need to stop obsessing about what's "legal" in T-TRAK.
I've never seen anyone going around issuing citations.
In fact, I just recently put on a show that had modules that had, gasp, ATLAS CODE 55 TRACK.
I guess the N-Rail undercover agents didn't make it to MARPM.
There is no such thing and not even a suggestion of T-TRAK or NEail types poo-pooing any T-TRAK concept that thinks outside of the box. In fact, quite the opposite.
Faaar more gatekeeping on this forum.
I’m definitely one of the ‘outside’ the box thinkers AND doers with T-TRAK, and I encourage that kind of thinking.
The discussion about the recommended standard of the use of Kato number 6s on the main (when one must use Kato - I like using Peco number 6s on the main too) is because of the issues with using a short radius turnout off of the main. It’s simple train dynamics.
Dave, I wasn’t intending to be cryptic. The standards document, under the “non standard” module section, which you read, stares that IF number 4s are used on a module (they mean anywhere on a module) they should be tweaked for performance and reliability due their reputation for issues.
The following section, which discusses “Track Standards” is where they specifically recommend the use of number 6s on the mains, rather than number 4s.
Nothing precludes one from using larger turnouts even.
And, if you never intend to involve any of your modules in a community setup, then it doesn’t matter anyway.
I’ve seen number 4s on the mains, tweaked and optimized, and they’ve presented no issues with trains running straight through on the mains… the only issues have been when they’ve been thrown for the diverging route as crossovers and present issues due to simple geometry and train dynamics (long equipment with body mounted couplers, backing movements through them, etc.).
If you can, you want to be that guy who has modules in a setup, that never present problems with anyone’s equipment; as opposed to being’ that guy’ whose modules prevents the reliable running of all trains across the layout.
Number 4s on the mains increase the potential for issues and that’s why the standards state what they do.