0 Members and 1 Guest are viewing this topic.
@MK erote an actual book about his Japanese rail Dave three so I expect that to be a top notch clinic.
Is 200 slides too many for an hour?
200 slides / hr = 18 seconds per slide. Too much
...T-TRAK Prototype Modeling (10:30 AM) — Presented by Craig LaingModeling prototype locations using the T-TRAK standard with an explanation of how he modeled a West Virginia town on the C&O Railway with all scratch-built structures....