0 Members and 1 Guest are viewing this topic.
I've been building all my Ttrak modules with Kato connectors on the minimum ends and immediately transitioning to Peco C55 over cork so that everything can be easily painted and ballasted, and I've never had anyone even notice tie size and spacing. I get a few forehead slaps when people see it because they assume that it 'has' to be done in Kato track or it's not legal. That's just one of many theoretical crimes I've committed on Ttrak.
I've been amused by modular standards since NTrak started many moons ago .. we have a group of like minded people that spend a lot of time and effort to develop them, write rules, evangelize, come up with verification schemes and multi-media to promote them. For them, there shall be no deviations. Then comes along a another group that look at the "rules" and scratch their heads, contemplate the meaning of the universe, and ask the question .. "why?" .. there is a potential better way and go forth and try it .. that's how innovation happens
Yeah whenever we do this there is always somebody who puts a hand up and goes "ERM ASHKUALLY" and then I have to show in the original standards that as written the ends just need to meet double track with Kato connectors. And then theres a whole section outlining the best practices for non standard modules length and width and how all track is acceptable in the middle as long as its not Atlas Code 55.
I look at "standards" as more of an average to assure a basic level of performance. I never delved into N Trak because I always thought the 3 track standard was unimaginative and unrealistic, although it allows for three trains to run the loops. I have seen some brilliant modules that deviate from the norms... somewhat... The Kentucky group that sets up at NSW every year, f'rinstance. But it's the structure and size of the N Trak modules that are now the non-starter. What those poor souls endure to set up and take down their exhibits exhausts me just to walk past it.As for scenery, with its bite size dominoes, I find TTrak far more flexible than N trak. As long as the track connection lands at the right elevation and alignment, all bets are off. Sure, the straights are straight, but align 2 or three doubles, and you can do some pretty neat stuff in between those Unijoiners.Lee
I look at "standards" as more of an average to assure a basic level of performance. I never delved into N Trak because I always thought the 3 track standard was unimaginative and unrealistic, although it allows for three trains to run the loops. I have seen some brilliant modules that deviate from the norms... somewhat... The Kentucky group that sets up at NSW every year, f'rinstance. But it's the structure and size of the N Trak modules that are now the non-starter. What those poor souls endure to set up and take down their exhibits exhausts me just to walk past it.
As for scenery, with its bite size dominoes, I find TTrak far more flexible than N trak. As long as the track connection lands at the right elevation and alignment, all bets are off. Sure, the straights are straight, but align 2 or three doubles, and you can do some pretty neat stuff in between those Unijoiners.Lee