I bought some styrene tubing 1/8" diameter, smallest I could find locally. Actually it's solid tubing with a tiny dimple in the center for starting a pilot hole, I assume. Even after a LOT of sanding it's still way too big to fit in the mounting hole of the truck frame. I suppose I could buy smaller tubing like 1/16" but can't seem to find any locally. Two other thoughts have occurred to me though. One is I could drill out the hole in the truck frame to accept the sanded down styrene rod, then glue it in and drill a pilot hole for the truck screws. My concern there is breaking the 3D printed frame while drilling. I've read this can be a concern with some 3D printed materials. Another option (maybe?) is to fill in the 3D truck mounting holes with two part epoxy, then drill out & screw into the epoxy. My feeling is it seems that the styrene tubing would be a more secure installation than trying to screw into two part epoxy. Has anyone done the two part epoxy technique before? I seem to have a bit of analysis paralysis on this project, lol! Thanks!
ATSF_Ron