0 Members and 1 Guest are viewing this topic.
I have just completed 16 hand laid #6 turnouts. I used a combination of rail craft and micro engineering code 55 rail. I had a stash of micro engineering rail joiners and that is when the problems started. Out of the fresh pack of joiners I could only get two of them to mount to the rail. The rest of the package was pure pain trying to get one of them to mount on the rail. Two tight, not the correct with width etc....... I had better luck in inserting them into my fingers (ouch). The track I am trying to attach to is micro engineering code 55 rail. What rail joiners have you used successfully attach code 55 rail without drawing blood, bending, and flinging across the room. ll
OK Bob, @robert3985 , what about expansion and contraction of the rail???????I have 2 yards that have close to 40 feet of straight runs and have to have expansion/contraction joints.The temperature change of only about 20 degrees, but it's enough that without them, I have tracks that looks like snakes. As you know, I use only ME track and I've tried to cut non-opposing gaps in the flex track, and that just causes derailments. I just live with the rail joiners and as tight as they are, they conform to the base of rail very good.
@rodsup9000However, for layouts that aren't portable and have longer rail runs, I recommend expansion joints, unsoldered tight rail joiners, approximately every 8 feet or so, with the rails at the joint having a bit of space between the ends....OR, especially with tight, stiff ME track, cutting the rails offset from each other (meaning not the same length), removing the ties, then cutting and removing corresponding lengths of rail from the other stick of flex but keeping the ties. Then slide the rails out of the piece that has the ties, and slide the corresponding rails into the spikeheads on the stick you've just removed the rails from. This give a near imperceptible joint, with no joiners and allows expansion and contraction if the rail ends aren't butted directly up against each other. In fact, some modelers do this for all their rail joints, supplying feeders on each piece of current-carrying rail so joiners aren't needed for electrical continuity.
@rodsup9000 I'm trying to perceive why cut gaps in your track's rail would cause derailments. How do you electrically gap your rails?? I've got plenty of gaps cut in my flex, some of them I reinforce with PCB ties, others I just leave, but I don't have derailment problems.
@rodsup9000 - I'm aware that different model railroaders have different techniques for lots of things. What you're happy with is what you're happy with. I attempt to present alternate ways of doing things that I've tried and had success with in case anybody else might find it fits their needs. ...I use runny CA to initially tack my track to the cork roadbed and I don't consider it "glued down" until I'm finished ballasting it, using a water/Mod Podge ballast glue mixture...and it's very solidly down and never has transformed into snakes.Cheerio!Bob Gilmore
I do this too (use CA to tack down the track), but a word of warning. If you have a foam sheet surface under your roadbed, the CA will dissolve it if you get too messy (like me).
@robert3985 that looks great! But you may have just convinced people to go with Unitrack Another option is Peco c55 flex and turnouts. The joiners are well below the spike heads. They do not play well with other brands though.