This part about my youth and prior attempts is super boring with no pictures. Scroll down to the bold heading that says “Fast forward to October” for current progress of you aren’t interested in my ramblings.
If you like ramblings, well read on my friends!
I’ve been wanting to model Store St ever since I was a kid. We would go to Victoria to visit my Grand Parents and every time we were down town I would ask my parents to walk me down the street so I could see where the tracks go. We never did as were always on some kind of a mission that did not include walking my elderly Grand Parents through an industrial district. The nerve!!
Anyway one time, in a mall, someone had a miniature architectural model of the downtown area and it included Store St and the Albion yard so for the first time I figured I had a handle on what these track were for! Trolley cars!!! Knowing nothing about railroading when I was young, (Dad said he was pretty sure they weren’t street cars, and that it was part of the E&N but what did he know?! Fool). Dad and I set about building a circle of track in the middle of my 4x8 HO layout, which of course ran across a blue bridge, and we found a pair of Bachmann “Downtown” trolley cars. All set!! It was spectacular.
When the internet was born I was finally able to research what it was all about. Street running!! This was way better than Trolleys. Oh yeah… and Dad was right. Actually he was right about a lot of things. But I digress.
Fast forward to 2004 ish and I’m finally prepping my basement for a railroad. I needed to build Store St now. Of course I had no finished basement, no railroad, and had never laid track…. So why not start with super difficult track?!
I wanted to be as prototypical as possible and researched girder rail. I happened upon
proto87stores.com.
He’s now closed up shop but at the time he was making beautiful turn out kits and girder rail. I contacted him and he was in the process of developing girder rail turn outs and crossings too. Albeit all for HO.
We discussed my project and he thought it could work for N and I promptly ordered a whole pile of rails and bits.
I decided since I didn’t have a railroad yet, I would assemble all of the important parts on styrene panels and make sort of modular. Then I could place them onto the railroad when done.
The concept worked for the straight parts and simple curves, but I needed to customize a lot of the rails to match the details on Store St. This didn’t go so well for the curved crossover at Swift St., for example. I tried to cut up bits of rail and grind them to intersect. But just made a mess of it. Ultimately the girder rail failed and I shelved the project.
Fast forward to October 2025…My wife and I went to Victoria to visit some family. We spent an afternoon tooling around in Victoria and finally, with no old people in tow to hold me back…. After 40 years of waiting…. I got to walk down Store St!
Even though she has no use for model trains, my wife loves my enthusiasm and is always game for my adventures. We walked down Store St, me putting one foot infront of the other, counting steps between each of the streets. How far apart they are, how wide they are etc etc. I also noted that there was a grade on Store St that I hadn’t noticed before. I took a bunch of pictures and made my notes.
At home I made a simple scale drawing of Store St.

I’m pretty simple when it comes to designing and I like to see he actual size of things.
So I got out a roll of paper and drew it all in full size 1:160. To see what I’m dealing with.
Here it is, to scale from Johnson St to the Albion yard. Beyond that I compressed it. I know you can’t really see much of the track drawings but it’s there.


A couple of years ago I salvaged an N scale model railroad that was being torn down. From this I have bench work in various shapes and I also salvaged a few dozen Peco C80 turnouts in a variety of sizes, both insulated and electro frog, including Peco turnout motors. From previous unrealized plans, I have a large inventory of Peco and Atlas C80 flex track.
So for this project I decided to use C80 flex track and Peco Electro-Frog turnouts in the portions that will be buried in the streets. The track and turnouts are so robust, in confident that they not need to be replaced. I’ll control them with the electric motors.
The tracks from the Johnson Street bridge to Store St will be C55 so that this end of the module set with the station is Free-mo-N compliant.
All tracks at the far end of the set, after the tracks leave Store St to serve Island Asphalt, ICG Gas and Captiol Iron, will be C40 flex and hand laid turnouts. I don’t care about compliance at this end as the entrance to Store St is a 9” radius and so anything past that is run at your own risk.
When I did the drawings I used the Peco turnouts as a guide for track layout.

After measuring what I had drawn I figure I could do it as a giant L. The main Store St leg being made of a 4ft and 6ft length, and the short leg for the Johnson St bridge being 4ft.
The bench work sections were 24” wide and I was initially thinking I’d narrow them to 15”

It was then that I decided not to do the yard and to flip the Johnson St bridge to the other side of Store St.

I decided to do 18” wide, so I got out the tools and started ripping it up.
I also needed to figure out what my grades were going to be.
As you leave Johnson St and make the turn on to Store St, the road goes slightly up hill to just before Swift St. I didn’t try to estimate this because it’s very gradual.
You can see it here in this pic.

And from the other direction here.

However, once you pass Swift St the road levels out a bit up to Herald, and then as you pass Kelly Douglas, it goes down hill at a decent grade.
From my measurements the Kelly Douglas spur was about 200ft long and at the steps at the end of the building, was about 10ft higher than the street. The grade carries on after this but these numbers gave me a place to start.
Here we are looking at the top of the grade at Herald St beside Kelly Douglas.

Here’s the corner of the former Kelly Douglas building. You can see the road beginning to descend to the right.

Here’s looking up grade, with Kelly Douglas on the right.

My guesstimate indicated that it’s about a 5% grade so I set to work testing a Life-Like SW900 on a grade with trains of up to 6 cars.


After doing a variety of tests I found that it could pull a 6 car train up 5% no problem. But this all blew up in my face later. Stay tuned for that. Haha.
I had salvaged a bunch of 1/8” and 1/4” plywood and strips of 3/4” plywood from @cnr when he moved. So I got work making road bed and end plates.
For the road bed I simple laid out strips or scraps of 1/8” plywood under my drawings and transferred them.

This mess is me realizing I originally drew the track arrangement to fit 24” wide and the. Adjusting it to fit 18”

Based on a 5% grade, I cut various risers to support the roadbed at various places, and set those aside.
Moving onto the end plates, these three modules would be permanently mated, so just the Free-mo-N end of Johnson St needed a flat compliant end.
The Johnson St Joint to Store Street, and the Propane/ Captiol Iron joint to Store Street need to be perfectly aligned everytime.
I came up with the idea of gluing 1/8” plywood strips to the ends so that they stick together like legos. Top and bottom strips ensure vertical alignment and one vertical strip in the middle ensure horizontal alignment.

The end plates had their alignment strips good on and then I screwed them together. I then ran the top edge through the table saw, taking off just a fraction of wood to true them up.

As I was setting up the modules on my basement floor, shimming to level, I noticed the ICG Propane/Capitol Iron module had developed a twist. Maybe cause it sat in the garage for two years and was now inside? Who knows. The other two were fine.
I discussed the issue with
@CNR5529 and we decided to engineer it. I used threaded rod and nuts to create diagonal truss rods, the thinking being that it would pull the corners in and eliminate the twist.


After some experimentation it helped a bit but didn’t eliminate the issue. So back to the table saw with another piece of bench work and it’s been good for a week or so now.
Bench work woes sorted, I went back to the endplates which were now dried for about a week. The Johnson St ends went in perfectly and the alignment scheme worked like a charm. The sections are held together with 3.5” bolts in T nuts, are solid and perfectly aligned.
At the Capitol Iron end I left the end plates off as the tracks will cross the joint at one grade for the main, and another for the sketch back to Capitol Iron so I opted to leave that until I had the road bed in so I could cut the end plates to the perfect height to support the road bed at the joint.
And so it was onto road bed. I got out all of my blocks I had cut and set about shimming and screwing and getting everything perfectly aligned. Under the main grade on Store St I glued a piece of 1” thick lumber for the length of the 200 ft grade (about 15” long) so that it would not be a big S shape after bending. This created nice easements about 3” long at the top and bottom.

I also needed the road portion of Swift St to bend gently downward. To accomplish this I set my table saw blade to half the depth of the wood and cut kerfs in the bottom of it over the distance I wanted it to bend.

This made it nice a floppy so once screwed in it made the soft transition to a grade I was after.

The exact position of the propane transfer was unknown so I left its road bed much wider. It will be trimmed later.
Swift, Kelly Douglas, ICG Propane, Island Asphalt and Capitol Iron are all 1/4” plywood plates that are on shims/blocks set at the correct height for the grades that run into them.



With all of this sorted out I got to gluing the blocks / shims down. This was easy as they are screwed to the road bed. I just flipped them over. Put some PL adhesive on the bottoms and then flipped them again and pressed them into place. I placed weights on everything and screwed some things down, and let it sit for a week.
With road bed in and dry I could finally do the end plate between Store St and the Propane/ Capitol Iron Module. I measure the height of the road bed for each leg, transferred those to the end plate, and cut the pair on my table saw.
I then covered both sides in PL, inserted them in the gap, fine tuned the placement to hold the road beds at just the right height, and clamped the modules together to bring them in tight using blocks I had screws to the side.



They sat drying for a week and the time came to separate them! I cut through the road bed at all of the joints with a razor saw. Johnson came apart no problem. The other end not so much. I had forgotten to take the screws out holding the end plates together from when I did the alignment strips. So now my modules were inaccessibly screwed together!
So I ripped them apart. No big deal. They are over built and the plates were held with dry wall screws. Problem solved.
Modules built and road bed in place it was time to get some track on and do some testing!!!
I nailed on a few lengths of C80 flex and connected a power pack.
Trains handled the grade in front of Kelly Douglas no problem…. But I was only able to pull 4 car trains. And it was slipping on the S curve down to the Propane spur and Capitol Iron. In my tests I used a shorter length grade and didn’t account for the S curve on the grade with a tight radius. D’oh. This is where it blew up in my face.
There were a couple of other issues as well. The joint at Store/Propane actually had a dip in its so bad I needed a weight to get the track to sit down in it.

So combined with tight radius, grade, and S curve, it was a bit roller coaster like and causing my longer LPG cars to derail.
No matter. We will succeed.
At this point my back was tired of working on the floor and it was time to get these on the wall.
I prepped my chosen spot and screwed some heavy duty shelf brackets to the wall. The track is suppose to be 60”. It’s actually 59 1/4” - when I measured I used the side of a module forgetting I had 2” of foam on the Johnson St module so initially the modules were 2” too high. Moving the shelf brackets down two positions got me to 59 1/4”. No matter for now. If I ever connect this set to the railroad in the other room I’ll raise the brackets. For now it’s on the wall!!

This has been very beneficial as I can eye ball the road bed at eye level and I’ve identified a few issues. I mentioned the dip at the joint. There’s also one part of the propane grade that’s much steeper than the rest. You can see the space under the straight edge here.

I got out the Multimax tool and cut the road bed away at the Store/Propane joint. It immediately relaxed into a more neutral state.

A small shim under that took care of the dip.

A shim under one support block took care of that other grade variation.
Now I can run 4 cars with no derailing or slipping from the Propane spur at the bottom all the way up to Johnson St.
I’m planning to do more adjustments to the over all grade. I’d like to get it to 5 cars. Also
@CNR5529 is sending a Bachmann 44 and 70 toner home with my son from Ottawa, so I can test those. I’d really like to know what they can pull and if I have to I’ll adjust the grades so they can reliably pull a train. It might have to be shorter. Maybe 3 or even 2 cars. But that will make oops fun. I’ll make a timetable for operators to follow.
For now I’m really pleased with where it’s at. It’s turning into a real thing and I am actually running trains on Store St now.
More to follow once the locos arrive.